Port of Dover Maintenance Dredging 2024-2028
A Utilities Contract Notice
by DOVER HARBOUR BOARD
- Source
- Find a Tender
- Type
- Framework (Services)
- Duration
- not specified
- Value
- ___
- Sector
- ENVIRONMENT
- Published
- 21 Feb 2024
- Delivery
- From 02 Sep 2024 (est.)
- Deadline
- 15 Mar 2024 10:00
Concepts
Location
The Port of Dover
2 buyers
- Dover Harbour Board Dover
Description
The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt. With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010. Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor. Pre-dredge surveys to be carried outby Employer using a multi-beam echo sounder, resulting in near total seabed coverage, intermediate or during dredge surveys conducted by the contractor will be verified by the Employer.
Renewal Options
4 year Framework with 1+1 extension 4 year Framework with 1+1 extension
CPV Codes
- 98360000 - Marine services
Indicators
- Bids should cover the whole contract.
- Options are available.
- Renewals are available.
- Award on basis of price and quality.
Reference
- FTS 005604-2024