E50 Roger Howe A685 Joint Replacement and Concrete Repairs

A Contract Award Notice
by WESTMORLAND AND FURNESS COUNCIL

Source
Contracts Finder
Type
Contract (Works)
Duration
0.5 year
Value
£150K
Sector
CONSTRUCTION
Published
25 Nov 2024
Delivery
07 Oct 2024 to 31 Mar 2025
Deadline
09 Aug 2024 11:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

Description

Roger Howe bridge was constructed as part of the M6 motorway building programme through Cumbria in the late 1960's early 1970's. It carries the A685 over the River Lune and is located to the North East of Kendal. It is a five-span bridge formed from precast pre-tensioned beams, in-situ concrete slabs, columns, crossheads and abutments. This contract is for the replacement of the 6 movement joints at the 6 half-joint locations across the full width of the bridge as well as for undertaking concrete repairs at these joints, including precast concrete beams, insitu concrete crossheads and insitu concrete deck at half-joint locations. It also includes for the vegetation removal and the sealing of gaps between parapet plinths and the parapet coping joints at half-joint locations. In addition the contract is for undertaking a Principal Bridge Inspection, and an Inspection for Assessment. Structural Review of the bridge, excluding the half-joints, which have already been undertaken by WSP UK Limited, is to be undertaken as part of the contract.\\r\r The tender is advertised via

Award Detail

1 Metcalfe Plant Hire (None)
  • Value: £146,960

CPV Codes

  • 45221100 - Construction work for bridges

Indicators

  • Contract is suitable for SMEs.

Other Information

The Chest, if you are not already registered on the portal the help you need to get started can be found here https://www.the-chest.org.uk/. All details are in the documents within the tender and available via the above portal. Should you have any further questions please direct them via the messaging system on The Chest.\\r\r