Provision for Phased strip up and replacement of 36,000m2 of resin bonded Gold Top tarmac to Lee Valley owned areas on Queen Elizabeth Olympic Park
A Tender Notice
by LEE VALLEY REGIONAL PARK AUTHORITY
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 6 year
- Value
- 2M
- Sector
- CONSTRUCTION
- Published
- 17 Dec 2024
- Delivery
- To 06 May 2031 (est.)
- Deadline
- 04 Feb 2025 12:00
Concepts
Location
Queen Elizabeth Olympic ParkStratfordLondonE20 2ST
1 buyer
Description
The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey andTennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded ‘Gold Top’ surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below.
Total Quantity or Scope
The Lee Valley Hockey and Tennis Centre.
CPV Codes
- 45233253 - Surface work for footpaths
Indicators
- Bids should cover the whole contract.
- Renewals are not available.
- Award on basis of price and quality.
Reference
- FTS 040576-2024