CON20013 - Roof Replacemet and Solar Photovoltaic Installation Project
A Contract Award Notice
by UK SHARED BUSINESS SERVICES LIMITED
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 14.5 month (est.)
- Value
- £1M
- Sector
- CONSTRUCTION
- Published
- 06 May 2021
- Delivery
- 08 Jan 2021 to 31 Mar 2022 (est.)
- Deadline
- n/a
Concepts
Location
East Midlands England: British Antarctic Survey High Cross, Madingley Road Cambridge CB3 0ET
1 buyer
- UK Shared Business Services Swindon
1 supplier
- Breyer Group Essex
Description
UK Research and Innovation (UKRI), wishes to establish a contract for the Roof replacement and Solar Photovoltaic Installation Project at the British Antarctic Survey in Cambridge. UK SBS is managing this procurement process in accordance with the Public Contracts Regulations 2015 (as amended from time to time) (the "Regulations") and EU Treaty Principles. This is a Services Contract being procured under the OJEU Open Procedure Regulations. See Section I.3 for access to procurement documentation
Total Quantity or Scope
See Section I.3 for access to procurement documentation. The project scope comprises the replacement of an existing roof, the removal of asbestos, supporting infrastructure and modifications and the installation of solar panels on 1) the newly replaced roof of the BAS Supply Chain Logistics building and 2) the existing roof of the BAS Science Building 2 as well as the supply and fit of new doors and windows, and re-rendering to the BAS supply chain Logistics building. The British Antarctic Survey (BAS) has recently committed to achieve Net Zero Carbon Emissions by 2040 from its directly managed operations. As part of this commitment, this project will facilitate the low carbon transition of BAS offices in Cambridge by increasing the solar capacity of the site and reducing our environmental impact. This project aims to provide a minimum additional 450kW of solar photovoltaic power generation installed in both roofs which will meet 17 % of the site's electricity demands and will contribute to a reduction of 90 tonnes of CO2e. It is intended that the services will be managed using the NEC Engineering and Construction Contract (NEC4) Option A - Fixed Price with Activity Schedule. The project is to be split into two phases which, subject to funding, may be run in series. Phase 1. To be completed and invoiced by mid-March 2021 • Complete Installation and integration of solar array on SB2. • Roof, window and complete solar installation on east section of Logistics building. Subject to a successful bid for further funding: Phase 2. To be completed and invoiced by mid- March 2022 • Roof, window and door replacement and complete solar installation on west section of Logistics building. It is intended that work on site shall commence as soon as possible. All units shall be commissioned, tested and handed over by the end of March 2022 at the latest. The ambition is to have seamless transition between the phases. The Contracting Authority reserves the right to conclude the Contract once Phase 1 Works have been completed and shall not be bound to carry the Contract through to ultimate completion in series. A brief summary of the requirements has been provided above, please ensure you review all additional appendices for full details of this requirement. All additional appendices can be found within Stage One: Overview Section on the Delta eSourcing Portal.
Award Detail
1 | Breyer Group (Essex)
|
Award Criteria
Quality | 70.00% |
Price | 30.00% |
CPV Codes
- 45261215 - Solar panel roof-covering work
- 09331200 - Solar photovoltaic modules
- 44221000 - Windows, doors and related items
- 45261900 - Roof repair and maintenance work
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-02adda
- FTS 009833-2021