National Museums Liverpool - Roof repair work at Juniper St Building

A Contract Award Notice
by NATIONAL MUSEUMS LIVERPOOL

Source
Contracts Finder
Type
Contract (Works)
Duration
1 month
Value
£131K
Sector
CONSTRUCTION
Published
09 Jun 2021
Delivery
22 Feb 2021 to 26 Mar 2021
Deadline
22 Jan 2021 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

** Please do not attend site without booking an appointment ** Bidders are asked to submit a formal tender for the "Juniper Street Building 1 Roof Repair Project" NML is looking to appoint a Principle Contractor to complete a package of works to make the building watertight and extend the building life span. The work has been separated into Required work and Desirable work. The reason for this being the Required work is immediate to stop the severe water ingress when the Desirable will extend the building life span. We may not be able to go ahead with Desirable depending on budget restraints. Required • For Roof A & Roof B required work is clean and remove all debris of the gutters before the roof takes place. • Fully remove and re-line gutters with a rolled-on membrane which is then fixed to the abutment under the flashing. This is done with combination of mechanical fixings and hot air welds. The system would include the insertion of liners into the rainwater outlets are heat welded into place. • For Roof B a steel flashing should be used to cover the edges of the new gutter lining. • Replace all the spouts on Roof A & B. • As part of this work to Roof B application of the membrane you will be required to lift the coping stones in order to allow the new gutter lining. • Reduce the parapet ere is parapet between two sections of the single storey roof. • Complete design and install for a compliant safe access system for Roof B Desirable • On Roof A the hip ridges, water seeps through due to the insulation being decayed or lost in some areas. The flashings need to be lifted and the fillers need to be replaced and the flashings re-instated. • Cut edge corrosion repair should be undertaken.

Award Detail

1 Bodacc (Gwynedd)
  • Value: £130,570

CPV Codes

  • 45000000 - Construction work

Indicators

  • Contract is suitable for SMEs.
  • Contract is suitable for VCOs.

Other Information

Tender Specification .Juniper Street B1 Roof Repair Tender.docx Appendix A - T2 Form of Tender Appendix A - T2 Form of Tender.doc Appendix B - NML Supplemental Conditions Appendix B - NML Supplemental Conditions.doc Appendix C - Safety Guidelines for Contractors 2015 Appendix C - Safety Guidelines for Contractors 2015.doc Appendix D - H & S Questionnaire Appendix D - H & S Questionnaire.doc Appendix E - NML Procurement Protocol Appendix E - NML Procurement Protocol.docx Appendix F - Pre-Construction Information - Juniper Street Roof Repairs Appendix F - Pre-Construction Information - Juniper Street Roof Repairs.pdf Appendix G - Tender Summary Sheet Appendix G - Tender Summary Sheet.docx Appendix H - Preliminaries JCT ICD 2016 Appendix H - Preliminaries JCT ICD 2016.pdf Appendix I - Roof Condition Survey Appendix I - Roof Condition Survey.pdf Appendix J -SC CW to E Appendix J -SC CW to E.PDF Appendix K - Contractor Document Information Appendix K - Contractor Document Information .docx Appendix L - R&D Asbestos Survey - Scheduled 8012021 Appendix L - R&D Asbestos Survey - Scheduled 8012021.pdf Appendix M - Safe Access Testing Certificates Appendix M - Safe Access Testing Certificates.pdf Q&As NML Juniper St Roof Repairs Tender Questions.docx Roof A1 Roof A #1.jpg Roof A2 Roof A #2.jpg Roof A3 Roof A #3.jpeg Roof B1 Roof B #1.jpg Roof B2 Roof B #2.jpg Roof B3 Roof B #3.jpg Roof B4 Roof B #4.jpeg Roof B5 Roof B #5.jpeg Roof B6 Roof B #6.jpeg Juniper Street 1 R&D Survey Report 21.01.2021 Juniper Street 1 R&D Survey Report 21.01.2021.pdf Pre-Construction Information - Juniper Street Roof Repairs v2 Pre-Construction Information - Juniper Street Roof Repairs v2.pdf

Reference

Domains