Modern Methods of Construction (MMC) New Homes Framework NH3
A Contract Award Notice
by LHC PROCUREMENT GROUP LIMITED
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- not specified
- Value
- £600M
- Sector
- CONSTRUCTION
- Published
- 04 May 2023
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
North East England:
1 buyer
- LHC Procurement Group Uxbridge
32 suppliers
- Beattie Passive Operations Norwich
- BWF Construction Services Truro
- Corehaus Knowsley
- JG Hale Construction Neath
- Module Ar Hull
- Reds10 London
- Rollalong Wimborne
- Stelling Properties Winchester
- Zed Pods London
- Tophat Communities Derby
- Celtic Horizons Caerphilly
- Local Homes Walsall
- Donaldson Timber Systems Oxford
- Sigmat Skipton
- A&E Elkins London
- Brady Construction Services Bodmin
- Burmor Construction Peterborough
- Classic Builders South West Plymouth
- Construction Total Solutions Bristol
- Ew Beard Swindon
- Kind & Co Builders London
- RG Carter Cambridge Norwich
- Spacemaker Developments St Neots
- Vistry Partnerships West Malling
- Cormac Contracting Redruth
- E J Taylor Chelmsford
- GB Construction Herts Drayton Parslow
- Knights Construction Wrexham
- Natta Building Farnham
- P Casey Land Reclamation Rochdale
- Tercon Bristol
- Vhe Construction Leeds
Description
The framework will cover the geographical area of England and has been procured on behalf of: LHC Consortium Procurement Construction (CPC) South-West Procurement Alliance (SWPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for the construction of Modern Methods of Construction (MMC) New Homes and associated works. The framework consists of 4 (four) workstreams and each workstream has multiple lots. As follows: Workstream 1 - Three Dimensional (3D) Modular Systems - Category 1 Lots 1-7 Workstream 2 - Two Dimensional (2D) Panelised Systems - Category 2 Lots 8-10 Workstream 3 - Main Contractors Delivering MMC Solutions - Lots 11-17 Workstream 4 - Groundworks and Site preparation for MMC Housing Projects - Lot 18 This framework agreement will commence on the 2nd May 2023 and will last for 48 months.
Lot Division
1 | 3D Modular Low Rise Housing and Apartments up to 11m - 0 - 9 Units Lot 1 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. This workstream also allows for the installation of volumetric units. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
2 | 3D Modular Low Rise Housing and Apartments up to 11m - 10 - 19 Units Lot 2 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. This workstream also allows for the installation of volumetric units. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites Award Criteria
| ||||||||
3 | Lot 3 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. This workstream also allows for the installation of volumetric units. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
4 | 3D Modular Low Rise Housing and Apartments up to 11m - 50+ Units Lot 4 covers low rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. This workstream also allows for the installation of volumetric units. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
5 | 3D Modular High Rise Housing - 11m or Higher Lot 5 covers Medium to High Rise volumetric three dimensional units. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This lot covers projects for Medium to High rise developments with floor heights above 11m covering flats/apartments and mixed use projects. This workstream also allows for the installation of volumetric units. Award Criteria
| ||||||||
6 | 3D Modular Independent & Assisted Housing and Care Homes Lot 6 covers the provision of specialist housing including Care Homes, Extra Care Housing, Sheltered Housing and Assisted Living Housing. Volumetric units can be brought to final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units. Award Criteria
| ||||||||
7 | 3D Modular Adaptive Pods Lot 7 covers the requirement for units to provide additional accommodation (Assisted bathrooms/Bedrooms etc for disabled users) as a single storey extension for existing housing units. The internal design and layout will be bespoke to meet the specific end user requirements. Award Criteria
| ||||||||
8 | 2D Panelised Systems - Supply Only Lot 8 covers the supply only of panelised systems including systems such as timber, light gauge steel frames and Structural Insulated Panels (SIPS) or other alternatives. Appointed companies will be able to provide: Basic frames (2a) Enhanced insulations and lining materials (2b) Further enhanced including windows and cladding (2c) This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
9 | 2D Panelised Systems - Installers Lot 9 is for installation panelised systems, such as timber, light gauge steel frames and Structural Insulated Panels (SIPS) or other alternatives by specialist installers. Award Criteria
| ||||||||
10 | 2DPanelised Systems - Supply and Installation Lot 10 covers the supply and installation of panelised systems including systems such as timber, light gauge steel frames and Structural Insulated Panels (SIPS) or other alternatives. Appointed companies will be able to provide: Basic frames (2a) Enhanced insulations and lining materials (2b) Further enhanced including windows and cladding (2c) This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
11 | Main Contractors Low Rise Housing and Apartments up to 11m - 0 - 9 Units Lot 11 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, civils, roadways, drainage installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party supplying any MMC categories or another organisation awarded on the framework supplying MMC categories 1 and 2. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
12 | Main Contractors Low Rise Housing and Apartments up to 11m - 10 - 19 Units Lot 12 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, civils, roadways, drainage installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party supplying any MMC categories or another organisation awarded on the framework supplying MMC categories 1 and 2. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
13 | Main Contractors Low Rise Housing and Apartments up to 11m - 20 - 49 Units Lot 13 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able 19/08/2022, 13:03 Modern Methods of Construction (MMC) New Homes Framework NH3 - Find a Tender https://www.find-tender.service.gov.uk/Notice/023069-2022/Private?origin=Dashboard 32/54 Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, civils, roadways, drainage installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party supplying any MMC categories or another organisation awarded on the framework supplying MMC categories 1 and 2. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
14 | Main Contractors Low Rise Housing and Apartments up to 11m - 50+ Units Lot 14 encompasses all low rise housing up to 11m in height but typically up to 4 storeys high. Appointed Companies will also be able to deliver Adaptive Pods, this will include the pod and all ancillary works required to install and integrate the pod with the existing property. This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, civils, roadways, drainage installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party supplying any MMC categories or another organisation awarded on the framework supplying MMC categories 1 and 2. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
15 | Main Contractors High Rise Housing - 11m or Higher Lot 15 covers projects for Medium to High rise developments with floor heights above 11m covering flats/apartments and mixed use projects. This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, civils, roadways, drainage installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party supplying any MMC categories or another organisation awarded on the framework supplying MMC categories 1 and 2. This encompasses (but is not limited to) flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
16 | Main Contractors Care Homes and Specialised Housing Lot 16 covers the provision of specialist housing including Care Homes, Extra Care Housing, Sheltered Housing and Assisted Living Housing. This lot is for main contractors who can provide MMC solutions and Principal Contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, civils, roadways, drainage installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party supplying any MMC categories or another organisation awarded on the framework supplying MMC categories 1 and 2. To encourage SMEs and regional bidders each lot is also broken down into multiple regional areas bidders can apply for. Award Criteria
| ||||||||
17 | Main Contractors 'Room on the Roof Lot 17 covers the provision of additional residential accommodation on top of an existing building, (this will include the accommodation and all associated works). In addition to the room on the roof accommodation, refurbishment and energy efficiency measures may need to be provided to the existing building as part of the project. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party supplying any MMC categories or another organisation awarded on the framework supplying MMC categories 1 and 2. This encompasses (but is not limited to) houses, bungalows, flats, apartments, key worker accommodation, temporary accommodation and mixed use sites. Award Criteria
| ||||||||
18 | Groundworks and Associated Works Lot 18 is for the provision of Groundworks and associated services encompassing: Ground Works Civil Engineering and Drainage Roadworks and S278 Works Site Setup and enabling works Hard landscaping Geotechnical and exploratory ground investigation and surveys Remediation Drainage Foundations Retaining Wall Award Criteria
| ||||||||
19 | Workstream 1 3D Modular Low Rise Housing Superlot Following the evaluation process all companies appointed to one or more of the low rise housing lots 1-4 have been automatically added to the respective superlot. The superlot can be used for call off opportunities where one of the following criteria applies: - A client does not receive a suitable number of responses (either at EOI stage or call off tender stage) having advertised their opportunity through the appropriate lot, value band, and geographical area. - Where there are insufficient Appointed Companies in the relevant lot, value band and geographical area to run the client's preferred call off procedure. No ranking will be applied within the superlot, and call off will be through mini competition only. Award Criteria
| ||||||||
20 | Main Contractors Low Rise Housing Superlot Following the evaluation process all companies appointed to one or more of the main contractors low rise housing lots 11-14 have been automatically added to the respective superlot. The superlot can be used for call off opportunities where one of the following criteria applies: - A client does not receive a suitable number of responses (either at EOI stage or call off tender stage) having advertised their opportunity through the appropriate lot, value band, and geographical area. - Where there are insufficient Appointed Companies in the relevant lot, value band and geographical area to run the client's preferred call off procedure. No ranking will be applied within the superlot, and call off will be through mini competition only. Award Criteria
|
Award Detail
1 | Beattie Passive Operations (Norwich)
|
2 | BWF Construction Services (Truro)
|
3 | Corehaus (Knowsley)
|
4 | JG Hale Construction (Neath)
|
5 | Module Ar (Hull)
|
6 | Reds10 (London)
|
7 | Rollalong (Wimborne)
|
8 | Stelling Properties (Winchester)
|
9 | Zed Pods (London)
|
10 | Beattie Passive Operations (Norwich)
|
11 | JG Hale Construction (Neath)
|
12 | Module Ar (Hull)
|
13 | Reds10 (London)
|
14 | Rollalong (Wimborne)
|
15 | Zed Pods (London)
|
16 | JG Hale Construction (Neath)
|
17 | Module Ar (Hull)
|
18 | Reds10 (London)
|
19 | Rollalong (Wimborne)
|
20 | Tophat Communities (Derby)
|
21 | JG Hale Construction (Neath)
|
22 | Module Ar (Hull)
|
23 | Reds10 (London)
|
24 | Module Ar (Hull)
|
25 | Module Ar (Hull)
|
26 | Rollalong (Wimborne)
|
27 | Corehaus (Knowsley)
|
28 | Celtic Horizons (Caerphilly)
|
29 | JG Hale Construction (Neath)
|
30 | Local Homes (Walsall)
|
31 | Celtic Horizons (Caerphilly)
|
32 | Donaldson Timber Systems (Oxford)
|
33 | JG Hale Construction (Neath)
|
34 | Local Homes (Walsall)
|
35 | Sigmat (Skipton)
|
36 | A&E Elkins (London)
|
37 | Beattie Passive Operations (Norwich)
|
38 | Brady Construction Services (Bodmin)
|
39 | Burmor Construction (Peterborough)
|
40 | Classic Builders South West (Plymouth)
|
41 | Construction Total Solutions (Bristol)
|
42 | Ew Beard (Swindon)
|
43 | Kind & Co Builders (London)
|
44 | Module Ar (Hull)
|
45 | RG Carter Cambridge (Norwich)
|
46 | Rollalong (Wimborne)
|
47 | Spacemaker Developments (St Neots)
|
48 | Stelling Properties (Winchester)
|
49 | Zed Pods (London)
|
50 | A&E Elkins (London)
|
51 | Beattie Passive Operations (Norwich)
|
52 | Brady Construction Services (Bodmin)
|
53 | Burmor Construction (Peterborough)
|
54 | Classic Builders South West (Plymouth)
|
55 | Construction Total Solutions (Bristol)
|
56 | Ew Beard (Swindon)
|
57 | Kind & Co Builders (London)
|
58 | Module Ar (Hull)
|
59 | RG Carter Cambridge (Norwich)
|
60 | Rollalong (Wimborne)
|
61 | Spacemaker Developments (St Neots)
|
62 | A&E Elkins (London)
|
63 | Brady Construction Services (Bodmin)
|
64 | Classic Builders South West (Plymouth)
|
65 | Ew Beard (Swindon)
|
66 | JG Hale Construction (Neath)
|
67 | Kind & Co Builders (London)
|
68 | Module Ar (Hull)
|
69 | RG Carter Cambridge (Norwich)
|
70 | Rollalong (Wimborne)
|
71 | Kind & Co Builders (London)
|
72 | RG Carter Cambridge (Norwich)
|
73 | Vistry Partnerships (West Malling)
|
74 | RG Carter Cambridge (Norwich)
|
75 | Vistry Partnerships (West Malling)
|
76 | Classic Builders South West (Plymouth)
|
77 | Kind & Co Builders (London)
|
78 | Module Ar (Hull)
|
79 | RG Carter Cambridge (Norwich)
|
80 | Rollalong (Wimborne)
|
81 | Vistry Partnerships (West Malling)
|
82 | Kind & Co Builders (London)
|
83 | Zed Pods (London)
|
84 | Cormac Contracting (Redruth)
|
85 | E J Taylor (Chelmsford)
|
86 | GB Construction Herts (Drayton Parslow)
|
87 | Knights Construction (Wrexham)
|
88 | Natta Building (Farnham)
|
89 | P Casey Land Reclamation (Rochdale)
|
90 | Tercon (Bristol)
|
91 | Vhe Construction (Leeds)
|
92 | Beattie Passive Operations (Norwich)
|
93 | BWF Construction Services (Truro)
|
94 | Corehaus (Knowsley)
|
95 | JG Hale Construction (Neath)
|
96 | Module Ar (Hull)
|
97 | Reds10 (London)
|
98 | Rollalong (Wimborne)
|
99 | Stelling Properties (Winchester)
|
100 | Tophat Communities (Derby)
|
101 | Zed Pods (London)
|
102 | A&E Elkins (London)
|
103 | Beattie Passive Operations (Norwich)
|
104 | Brady Construction Services (Bodmin)
|
105 | Burmor Construction (Peterborough)
|
106 | Classic Builders South West (Plymouth)
|
107 | Construction Total Solutions (Bristol)
|
108 | Ew Beard (Swindon)
|
109 | Kind & Co Builders (London)
|
110 | Module Ar (Hull)
|
111 | RG Carter Cambridge (Norwich)
|
112 | Rollalong (Wimborne)
|
113 | Spacemaker Developments (St Neots)
|
114 | Stelling Properties (Winchester)
|
115 | Vistry Partnerships (West Malling)
|
116 | Zed Pods (London)
|
CPV Codes
- 45000000 - Construction work
- 44211000 - Prefabricated buildings
- 45211000 - Construction work for multi-dwelling buildings and individual houses
- 45223800 - Assembly and erection of prefabricated structures
- 45223810 - Prefabricated constructions
- 45223820 - Prefabricated units and components
- 45223821 - Prefabricated units
- 45223822 - Prefabricated components
- 44212000 - Structural products and parts except prefabricated buildings
- 44211100 - Modular and portable buildings
- 45100000 - Site preparation work
Indicators
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** LHC Procurement Group Limited is a not for profit central purchasing body acting on behalf of contracting authorities throughout England, Wales and Scotland (including partners of the Welsh Procurement Alliance, Scottish Procurement Alliance and South West Procurement Alliance) for whom we continue to monitor up to 500 live projects at any one time. Thanks to their ongoing and collective feedback and input into the development of this framework and given the reach and scale of their collective portfolios, the framework is both designed and anticipated to support the vast majority of requirements. Consequently, other contracting authorities that were not specifically consulted in the development of this framework may nevertheless also deem the framework to offer a value for money procurement solution for their own requirements and may also use the framework. As of the date of publication of this notice our frameworks may be used by all contracting authorities in England, Wales and Scotland as defined by the Public Contracts Regulations 2015 as listed on: https://www.cpconstruction.org.uk/who-we-work-with/ https://lse.lhcprocure.org.uk/who-we-work-with/ https://www.swpa.org.uk/who-we-work-with/ including, but not limited to Registered social landlords (RSL's), tenant management organisations (TMOs) and arm's length management organisations (ALMOs), local authorities and any subsidiaries and joint-venture vehicles of those local authorities, health authorities, councils, boards and trusts, publicly funded schools, universities and further education establishments, colleges, police forces, fire and rescue services or registered charities. LHC clients may add community benefit requirements in their call-off contracts from this Framework including but not limited to: - to generate employment and training opportunities for priority groups; - vocational training; - to up-skill the existing workforce; - equality and diversity initiatives; - to make sub-contracting opportunities available to SMEs, the third sector and supported businesses; - supply-chain development activity; - to build capacity in community organisations; - educational support initiatives.
Reference
- ocds-h6vhtk-03130f
- FTS 012799-2023