New Museum Project - Trade Package: Main Demolition Work

A Contract Award Notice
by MUSEUM OF LONDON

Source
Find a Tender
Type
Contract (Works)
Duration
0.5 year (est.)
Value
£10M
Sector
CONSTRUCTION
Published
22 Mar 2024
Delivery
31 Aug 2023 to 01 Mar 2024 (est.)
Deadline
n/a

Concepts

Location

Camden and City of London

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

The Museum of London is looking to award Keltbray Built Environment Ltd to provide demolition works as part the Museum of London's New Museum Project. These works are to be contracted as a trade contract with the Museum of London, working under its nominated Construction Manager. These works shall comprise the planning, sequencing, management, temporary works design, coordination, project specific method statements, technical submittals, risk assessments, delivery, offloading, storage, distribution, setting out, positioning, demolition, strip-out, integration of specialists Trade Contract designs, monitoring, and handover of the complete Strip-Out and Demolition Works.

Total Quantity or Scope

This Trade Contract Works shall comprise the planning, sequencing, management, temporary works design, coordination, project specific method statements, technical submittals, risk assessments, delivery, offloading, storage, distribution, setting out, positioning, demolition, strip-out, integration of specialists Trade Contract designs, monitoring, and handover of the complete Strip-Out and Demolition Works to the following, but not limited to: - Careful removal and salvaging of items to be re-used throughout the building - Strip out and removal of floor finishes, wall finishes, internal walls and staircases, doors, ceilings, roller shutters, louvres, signage and redundant services - Removal of roof access and roof coverings - Making good to walls, columns, slabs & soffits - Cleaning of existing concrete surfaces - Removal of existing external doors, windows, shutters, cills etc - Structural demolition of concrete slabs, walls, precast panels, staircase, load bearing masonry walls - Removal of existing steelwork - Forming of openings in RC slabs and walls - Removal of brickwork facade, precast beams, glazing framework to the roof

Award Detail

1 Keltbray Built Environment (Esher)
  • Num offers: 2
  • Value: £10,460,472

Renewal Options

The Museum of London reserves the right to use sectional completion and/or other methods whereby services may be called off in sections dependent on the needs to the project and overall

Award Criteria

Criterion 1 40.0
Criterion 1 60.0

CPV Codes

  • 45111000 - Demolition, site preparation and clearance work
  • 45110000 - Building demolition and wrecking work and earthmoving work
  • 45111100 - Demolition work

Indicators

  • Options are available.
  • Award on basis of price and quality.