Freeze Dryer Phase II

A Prior Information Notice
by MHRA

Source
Find a Tender
Type
Contract (Services)
Duration
3 year
Value
600K
Sector
TECHNOLOGY
Published
08 Apr 2024
Delivery
To 15 Apr 2027 (est.)
Deadline
15 Apr 2024 12:00

Concepts

Location

NIBSC<br/>Blanche Lane<br/>Potters Bar<br/>Hertfordshire<br/>EN6 3QG

Geochart for 3 buyers and 0 suppliers

3 buyers

Description

To replace the PLC hardware for CS15 and CS150 with up-to-date equivalents that align with the Schneider upgrade path.To replace the HMI hardware for CS15 and CS150 with up-to-date equivalents that align with those used in Phase 1.To recreate the functionality of CS15 and CS150 PLCs like-for-like following the Schneider upgrade path.To re-create the CS15 and CS150 HMIs and allow for development of further requirement defined in collaboration with the MHRA.

Total Quantity or Scope

To replace the PLC hardware for CS15 and CS150 with up-to-date equivalents that align with the Schneider upgrade path.To replace the HMI hardware for CS15 and CS150 with up-to-date equivalents that align with those used in Phase 1.To recreate the functionality of CS15 and CS150 PLCs like-for-like following the Schneider upgrade path.To re-create the CS15 and CS150 HMIs and allow for development of further requirement defined in collaboration with the MHRA.1. Project Definition– All parties to agree scope and ensure that everything is available for project commencement. – MHRA to provide any existing software backups (PLC / SCADA source code).– For software that is not available (such as the HMI), the supplier is expected to work with the MHRA to develop the requirements for the HMI.– Both parties to agree deliverable format (e.g. schematic updates).2. Part Selection– Using the information gathered at the project definition stage, the supplier will select updated hardware and software packages for the PLCs, HMIs, SCADAs, data historian and anti-virus software.3. Electrical Design– With appropriate parts selected, the supplier will need to assess how the electrical design will be impacted by the proposed changes.– These impacts should be minimised wherever possible.– However, if changes are required, the supplier will need to modify any schematics while aligning with appropriate standards.4. Software Development– Software development for the PLC, HMI, SCADA and Data Historian can be started following on from part selection.– This will require the supplier to migrate functionality where possible.– Where the code cannot be migrated, the functionality will need to be replicated.– The HMI should be re-built to meet the requirements based on existing SCADA screens and workshops held with MHRA operators.5. FAT (Factory Acceptance Testing)– The control cabinets and associated hardware shall not be moved from the MHRA facility.– FAT is expected to test as much of the new software and hardware as possible without replicating site hardware.6. Plant Upgrades– This will include the MHRA ensuring that appropriate ethernet connection shall be made available and new virtual machines are available.7. SAT (Site Acceptance Testing)– SAT will need to be staggered to reduce any concurrent downtime to the freeze dryers. This will require testing and commissioning only one freeze dryer at a time.– SAT is expected to test all software and hardware associated with the replacement hardware and the existing site hardware.8. On-going contract Support– Support is expected for the warranty of the system following from SAT and moving onto general support for the years following the warranty end.– During these periods, the supplier is expected to ensure that recommend patches will not cause un-planned downtime.– It is desired that the supplier can also provide support for the Phase 1 system (CS100).

Renewal Options

Agency will have one twelve month extension option

Award Criteria

Quality 55.0
Social Value 10.0
Pricing 35.0

CPV Codes

  • 72100000 - Hardware consultancy services
  • 42961200 - Scada or equivalent system

Indicators

  • Bids should cover the whole contract.
  • Options are available.
  • Financial restrictions apply.
  • Professional qualifications are sought.
  • Award on basis of price and quality.