HS2 - Westgate Lightning Protection (Sub-subcontract Package)

A Tender Notice
by PHOENIX M E LTD

Source
Contracts Finder
Type
Contract (Works)
Duration
11.5 month
Value
£50K-£100K
Sector
INDUSTRIAL
Published
25 Jun 2024
Delivery
07 Jul 2024 to 27 Jun 2025
Deadline
30 Jun 2024 09:15

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

To undertakes the design, procurement, delivery, off-loading installation, testing, setting to work, commissioning, assurance, maintenance and handover of Westgate ventilation shaft lightning protection works as further described within this information To install a complete and compliant lightning protection installation in line with the project specifications including (but not limited to) the following: • Installation of earth tapes on the head house and connections to the earthing system as per the contract drawings and earthing schematics. • Installation of test pits and earthing rods as detailed in the design drawings. • Fixing of earth tapes and connections of tapes and cables as per design drawings • Connection to earthing networks / systems installed by others. • Any labelling required for tapes and cables • Testing of earth bars and cabling To undertake a lightning protection risk assessment in accordance with the requirements set out within BS EN 62305, the lighting protection risk assessment shall recognise the potentially high economic losses associated with the loss of the ventilation and intervention shaft or firefighting point. To use conductor tapes, running down the exterior of the building to separate earth rods, in preference to using structural steelwork where practicable to minimise the risk to sensitive equipment. To ensures that all cables running externally shall make as much use as practicable of natural shielding from fully bonded conducting materials. To assesses the lightning protection system for the incorporation of air termination networks on the roof and identify that best composition. To provide test joints for all down and earthing conductors and will be located in inspection pits adjacent to the above ground building foundations. To install surge protection devices for all cables passing through the lightning protection system and be class I type where cables enter and leave the building at roof level, conforming to IC 61643-12. To install class III type conforming to IC 61643-12 where cables enter and leave the building at ground level surge protection devices. To provides suitable warranties in line with industry standards.

CPV Codes

  • 45312310 - Lightning-protection works

Indicators

  • Contract is suitable for SMEs.

Other Information

Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=81813...

Reference

Domains