H3AT ADS

A Tender Notice
by UNITED KINGDOM ATOMIC ENERGY AUTHORITY

Source
Contracts Finder
Type
Contract (Products)
Duration
1 day
Value
___
Sector
INDUSTRIAL
Published
28 Oct 2024
Delivery
29 Nov 2024 to 30 Nov 2024
Deadline
28 Nov 2024 12:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

Description

The Supply of an ADS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA's Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. Sub-system Package - the package scope of work includes design, manufacture, assembly, Factory Acceptance Testing, delivery, supply, installation, Site Acceptance Testing and commissioning. Design - the package is to be produced by the Contractor and must support and contain the process equipment. Contractor is to identify tie-in connection points to process services as well as main process connections, process line and EC&I connections. Manufacturing, FAT, Delivery, Installation and SAT - the package requires manufacture, assembly, installation, and SAT. This involves delivery and installation of all the equipment fabricated/procured by the Contractor to include provision of interface control and electrical distribution boxes and specific tie points for process services and process connections etc. The Contractor shall undertake Factory Acceptance Testing to demonstrate the functionality of the ADS equipment assemblies, Site Acceptance Testing, and Integrated testing upon complete installation of the ADS Equipment Package. A full review of all documentation will be conducted by the Office of the Chief Engineer to ensure the ADS equipment assemblies meet all the requirements prior to delivery. The Contractor will deliver the equipment to Culham Campus and install. The Contractor will be required to carry out Site Acceptance Testing while a third party will conduct commissioning. Commissioning - The commissioning of the fully integrated subsystems shall be carried out by the UKAEA Operations team with support from the Systems Integrator and the Contractor. During inactive commissioning all operations will be tested, and the plant performance assessed under a wide range of expected operating conditions. The Contractor shall provide, People Rates for assisting

CPV Codes

  • 44610000 - Tanks, reservoirs, containers and pressure vessels
  • 09310000 - Electricity
  • 09343000 - Radioactive materials
  • 09320000 - Steam, hot water and associated products
  • 09344000 - Radio-isotopes
  • 24111000 - Hydrogen, argon, rare gases, nitrogen and oxygen
  • 24111600 - Hydrogen
  • 31161400 - Primary water systems
  • 38340000 - Instruments for measuring quantities
  • 38420000 - Instruments for measuring flow, level and pressure of liquids and gases
  • 38570000 - Regulating and controlling instruments and apparatus
  • 38930000 - Humidity and moisture measuring instruments
  • 42120000 - Pumps and compressors
  • 42122100 - Pumps for liquids
  • 42131100 - Valves defined by function
  • 42131140 - Pressure-reducing, control, check or safety valves
  • 42900000 - Miscellaneous general and special-purpose machinery
  • 42993000 - Chemical industry machinery
  • 45255400 - Fabrication work
  • 45262670 - Metalworking
  • 45262680 - Welding
  • 45300000 - Building installation work
  • 51100000 - Installation services of electrical and mechanical equipment
  • 51110000 - Installation services of electrical equipment
  • 51120000 - Installation services of mechanical equipment
  • 51810000 - Installation services of tanks
  • 51820000 - Installation services of reservoirs
  • 71242000 - Project and design preparation, estimation of costs
  • 71320000 - Engineering design services
  • 71323200 - Plant engineering design services
  • 71335000 - Engineering studies

Other Information

Additional data https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=87078&B=UKAEA User / Company https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/72814

Reference

Domains