Harrow Campus Masterplan Consultancy
A Contract Award Notice
by THE UNIVERSITY OF WESTMINSTER
- Source
- Find a Tender
- Type
- Contract (Services)
- Duration
- 5.5 year (est.)
- Value
- £100K-£2M
- Sector
- CONSTRUCTION
- Published
- 30 Aug 2024
- Delivery
- 14 May 2023 to 31 Dec 2028 (est.)
- Deadline
- n/a
Concepts
Location
LONDON
2 buyers
- Westminster University London
8 suppliers
- PRP Architecture Thames Ditton
- Sphere25 Brentwood
- Troup Bywaters Anders London
- Campbell Reith Hill London
- Buro Happold Bath
- Turner & Townsend Leeds
- Exigere London
- Hoare Lea Bristol
Description
Consultancy support on the Harrow Campus Masterplan Project. The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026. The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application. Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot Division
1 | Harrow Campus Masterplan Consultancy - Architect Architect Consultancy support on the Harrow Campus Masterplan Project. |
2 | Harrow Campus Masterplan Consultancy - Planning Consultant Planning Consultancy support on the Harrow Campus Masterplan Project. |
3 | Harrow Campus Masterplan Consultancy - Services (M&E) Services (M&E) Consultancy support on the Harrow Campus Masterplan Project. |
4 | Harrow Campus Masterplan Consultancy - Civil Engineer Civil Engineer Consultancy support on the Harrow Campus Masterplan Project. |
5 | Harrow Campus Masterplan Consultancy - Fire Consultant Fire Consultancy support on the Harrow Campus Masterplan Project. |
6 | Harrow Campus Masterplan Consultancy - Project Manager Project Manager support on the Harrow Campus Masterplan Project. |
7 | Harrow Campus Masterplan Consultancy - Cost Manager Cost Manager support on the Harrow Campus Masterplan Project. |
8 | Harrow Campus Masterplan Consultancy - Acoustics and BREEAM Acoustic and BREEAM Consultancy support on the Harrow Campus Masterplan Project. |
Award Detail
1 | PRP Architecture (Thames Ditton)
|
2 | Sphere25 (Brentwood)
|
3 | Troup Bywaters Anders (London)
|
4 | Campbell Reith Hill (London)
|
5 | Buro Happold (Bath)
|
6 | Turner & Townsend (Leeds)
|
7 | Exigere (London)
|
8 | Hoare Lea (Bristol)
|
Award Criteria
PRICE | _ |
CPV Codes
- 71530000 - Construction consultancy services
Indicators
- Award on basis of price.
Reference
- FTS 027729-2024