North Ring Drain Bridge Replacement

A Contract Award Notice
by DEFRA NETWORK ETENDERING PORTAL

Source
Contracts Finder
Type
Contract (Works)
Duration
3.5 month
Value
£107K
Sector
CONSTRUCTION
Published
28 Jan 2021
Delivery
14 Dec 2020 to 01 Apr 2021
Deadline
26 Nov 2020 17:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

There is an existing bridge over the North Ring Drain, which consists of two concrete abutments, 7 steel beams and a concrete floor. Span is approximately 15m, width 5m. This bridge has reached the end of its life and needs replacement. The specification is to remove the existing bridge and replace with a new structure, to be designed by the contractor. It is assumed that this will be a culvert bridge, with a 600mm culvert and appropriate solid head walls and concrete road bed, and a capacity of at least 40 tonnes (total weight).

Award Detail

1 Amco (None)
  • Value: £106,610

CPV Codes

  • 71000000 - Architectural, construction, engineering and inspection services
  • 77000000 - Agricultural, forestry, horticultural, aquacultural and apicultural services

Indicators

  • Contract is suitable for SMEs.

Other Information

n/a North Ring Bridge - AMCO contract _ FULLY SIGNED_Redacted.pdf

Reference

Domains