Thames Tideway Tunnel - C405 Main Works West - Main Tunnel Steel Connection Shutters

A Tender Notice
by BMB JOINT VENTURE (BAM NUTTALL, MORGAN SINDALL PLC & BALFOUR BEATTY)

Source
Contracts Finder
Type
Contract (Works)
Duration
1.5 month
Value
___
Sector
CONSTRUCTION
Published
05 Feb 2021
Delivery
08 Mar 2021 to 30 Apr 2021
Deadline
19 Feb 2021 12:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Section 4: Scope of Works BMB JV are looking the supply only of all associate items required to assemble the Hammersmith, Putney and Barn Elms Connection Shutter as detailed in the drawings provided with this advert. Note designs for the Barn Elms Shutter are the same as those for the Putney Shutter. BMB will assemble the shutter in the tunnel. The supplier shall deliver the shutter in parts that can be easily handled into place at the Connection Ports. All delivery's will be to Carnwath Road Site. BMB will be responsible for moving the shutter into place in the tunnel. All deliveries must comply with BMB JV's delivery procedures including FORS. Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point. Provision of accurate product specifications to accompany the quotation.

CPV Codes

  • 45262670 - Metalworking

Other Information

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=53715...