Thames Tideway Tunnel - C405 Main Works West - Hammersmith Security Gates & Fencing
A Tender Notice
by BMB JOINT VENTURE (BAM NUTTALL, MORGAN SINDALL PLC & BALFOUR BEATTY)
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 2.5 month
- Value
- £1
- Sector
- CONSTRUCTION
- Published
- 17 Feb 2021
- Delivery
- 12 Mar 2021 to 31 May 2021
- Deadline
- 19 Feb 2021 12:00
Concepts
Location






1 buyer
Description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting & diverting combined sewage flows into a new storage & transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station & Bekesbourne Street. The geographic layout of the Project & local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture & store combined sewage from CSOs along its route & transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive &/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Section 4: Scope of Works BMB JV require an experienced Subcontractor to install high security gates and fence at Hammersmith Pumping Station Site (HAMPS). The security gates and fence will demarcate and protect the boundary between Fulham Reach Development and Thames Water. This will include the replacement of a vehicle gate and installation of a new pedestrian gate on Chancellor's Road boundary. Attached are gate 4 drawings for the works, the successful Subcontractor will be required to produce fabrication drawings to gate 5 for approval by the Contractor. The new fence is specified as high security proprietary Zaun Armaweave - refer to drg: '3320-AAJVX-TTWES-420-CR-DR-000106' for full specifications. The perimeter is highlighted in drg '3320-AAJVX-HAMPS-590-LZ-DR-000200 - Marked Up'. The area will be cleared & filled to substrate level by BMB JV. The Subcontractor will be required to construct the foundations & install the gate as per 3320-AAJVX-HAMPS-590-LZ-DR-000200 & 3320-AAJVX-HAMPS-590-LZ-DR-000300. Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design & engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to & demonstration of understanding of the drawings/specifications provided at this point. Provision of accurate product spec to accompany the quotation.
CPV Codes
- 34928200 - Fences
- 35000000 - Security, fire-fighting, police and defence equipment
Other Information
Supplier experience of similar projects, evidence of this may be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to disc BMB-JV Tideway West, Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=53753...