Modelling the benefits of dispersed SUDS for flood risk reduction and the management of urban drainage

A Contract Award Notice
by GREATER MANCHESTER COMBINED AUTHORITY

Source
Contracts Finder
Type
Contract (Services)
Duration
8 month
Value
£50K
Sector
CONSTRUCTION
Published
09 Mar 2021
Delivery
01 Mar 2021 to 31 Oct 2021
Deadline
05 Feb 2021 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

Greater Manchester Combined Authority (GMCA) is seeking technical support to design and model the benefits of nature based Sustainable Drainage Systems (hereafter SuDS) retrofit for a pilot area. The technical support team will develop and deliver a costed, green SuDS retrofit design for a discrete pilot area and model the impacts on the (1) predicted surface water flood risk extent and properties at risk and (2) the quantity of surface water entering the combined sewer system and sewer flood risk. Building climate resilience in Greater Manchester is one of the priorities of the Greater Manchester 5-Year Environment Plan and the Greater Manchester Strategy. SuDS offer solutions to urban challenges such as surface water flood risk, increasing quantities of water entering combined sewer systems and water quality in urban areas, in addition to numerous co-benefits for local urban residents and businesses. The GMCA-led IGNITION project has been working to explore and monetise the benefits of green SuDS retrofit, to inform the development of pipelines of investment in SuDS across Greater Manchester city region. A key barrier to investment in urban green SuDS is convincing those parties who will benefit to invest. To increase investor confidence in the performance of dispersed green SuDS in a discrete geographical area, this commission is for technical support to model the benefits of a dispersed streetscape SuDS retrofit design for a pilot urban area of GM. The retrofit will cover an urban neighbourhood of GM, the exact pilot area will be determined through opportunity mapping currently being undertaken by the IGNITION team initial results suggest this will be no larger than 0.5km2 and likely to be less than 0.25km2. The SuDS design will need to be costed and the priority benefits to be modelled include: (1) the impact on predicted surface water flood risk extents and properties at risk, (2) the impact on hydraulic sewer flooding both internal and external, (3) the impact on combined sewer overflow (CSO) spill frequency, (4) the impact on onward combined sewer pumping and wastewater treatment.

Award Detail

1 HR Wallingford (None)
  • Value: £41,000

CPV Codes

  • 45240000 - Construction work for water projects
  • 45262640 - Environmental improvement works
  • 71000000 - Architectural, construction, engineering and inspection services

Indicators

  • Contract is suitable for SMEs.
  • Contract is suitable for VCOs.

Other Information

*****Further Details can be found on The Chest @ https://www.the-chest.org.uk/ *****

Reference

Domains