Lower Thames Crossing - Kent Roads and Roads North of the Thames

A Tender Notice
by HIGHWAYS ENGLAND

Source
Contracts Finder
Type
Framework (Works)
Duration
7 year
Value
£2B
Sector
CONSTRUCTION
Published
20 Jul 2021
Delivery
01 Jan 2023 to 31 Dec 2029
Deadline
21 May 2021 12:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Due to an administrative error, whilst this Contract Notice was originally published on Find a Tender Service, it was not initially uploaded to Contract Finder. The notice is now being published to correct that error. This procurement is for the design and build of the following two lots which will be procured under a Competitive Procedure with Negotiation. The contracts will be based on the NEC4 Engineering and Construction Contract (ECC) form of contract. Each lot will consist of a two-stage contract approach; Stage One will involve development of the design, methodologies and price, followed by detailed design and construction in Stage Two. The scope for each lot is as follows: Lot 1: Kent Roads (£600,000,000.00) The contract is a design and build contract for part of the Project route connecting the A2/M2 Corridor via a multi-level free flowing complex junction to 1km south of the tunnel's southern portal. There are significant online works including the realignment and widening of the existing A2 and the construction of the Gravesend East Junction upgrade. The contract works comprise an A2 bridge over the LTC link, 2 viaducts, and numerous other bridge and retaining wall structures. The contract also includes the design, demolition and construction of a replacement green bridge for Brewers Road and Thong Lane over the A2 and a new green bridge over the new LTC alignment on Thong Lane. This contract includes significant diversion of key UK critical utilities, early archaeological investigation works and the relocation and management of the seasonal environmental works. Lot 2: Roads North of the Thames (£1,300,000,000.00) The contract is a design and build contract for part of the Project route that takes the project from 1km north of the tunnel's northern portal and continues for 12.7km though predominantly green field site to LTC's junction with the M25, the route includes 5km of online works between the junction with M25 and completes just north of M25 J29. The route is dual 3 lanes from the tunnel to the A13 interchange, a three level and between the A13 and M25 the route is 3 lanes northbound and 2 lanes southbound where it crosses under M25 via a box jack structure. Other significant features of the route are where it crosses the Tilbury loop line and A1089, a new multi-level junction connecting the route with the A13 near Orsett and a viaduct at the Mardyke river through Orsett Fen.

CPV Codes

  • 45000000 - Construction work

Other Information

The procurement documents are available for unrestricted and full direct access, free of charge, at: Find a Tender Notice https://www.find-tender.service.gov.uk/Notice/006746-2021?origin=SearchResults&a... FTS Notice FTS Notice.pdf

Reference

Domains