Camel Footbridge Wadebridge Maintenance and Repair

A Contract Award Notice
by CORSERV LTD ON BEHALF OF CORMAC SOLUTIONS LTD

Source
Contracts Finder
Type
Contract (Works)
Duration
0.5 year
Value
£250K
Sector
CONSTRUCTION
Published
07 Sep 2021
Delivery
01 Apr 2020 to 30 Sep 2020
Deadline
24 Jan 2020 00:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

Description

The Camel Footbridge carries the maintainable public footpath over the River Camel between Egloshayle Road and Wadebridge Town centre. The structure consists of a two span cable stayed suspension bridge. The total length is 62m with a main span of 40m. The bridge tower support is founded within the River bed and extends 16m high above the deck. The bridge consists of a steelwork deck frame and tower with timber decking and aluminium balustrading. The deck is suspended from 8 pairs of steel cables (16 cables and 32 connectors). The project aim is to undertake major maintenance works on the cable stay Camel footbridge in Wadebridge safeguarding the structure for continued use. The intention is to appoint a suitably qualified and experienced contractor to undertake this works.

Award Detail

1 Not Awarded Retendered Sept 21 Corserv DN562948 Refers (None)

CPV Codes

  • 45221119 - Bridge renewal construction work
  • 45221110 - Bridge construction work

Indicators

  • Contract is suitable for SMEs.

Other Information

The tender can be accessed via the Proactis Supplying the South West etendering portal. Here is the link: https://procontract.due-north.com/Advert?advertId=5e614756-fb1f-ea11-80fc-005056...

Reference

Domains