Design and Installation of Event Duration Monitors and Flow Monitoring at Thames Water's Sewage Treatment Works
A Contract Award Notice
by THAMES WATER UTILITIES LIMITED
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- not specified
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 20 Sep 2021
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
London: The whole of the Thames Water region
1 buyer
- Thames Water Utilities Reading
1 supplier
- Unnamed None
Description
Provision of MCERTS Event Duration Monitors (EDMs) (U_MON3 driver) to detect start and stop times of overflows to storm tanks, off-line storage, on-line storage, land treatment area or direct to the environment. Provision of MCERTS pass forward flow (PFF) monitors (U_MON4 Driver). The solutions can involve the condition assessment and modification of pre-existing installations to meet the MCERTS standard, or the first-time installation of a PFF instruments. Provision MCERTS flow monitoring for the first time flow (U_MON5) where permitted DWF or maximum daily flow is greater than 50m3/d at sewage treatment works (STWs). Installations may require a degree of civils work as part of the installation, including but not limited to new flume channel or wash out chambers.
Total Quantity or Scope
Provision MCERTS flow monitoring for the first time (U_MON5) where permitted DWF or maximum daily flow is greater than 50m3/d at sewage treatment works (STWs).
Award Detail
1 | Unnamed (None)
|
CPV Codes
- 45252100 - Sewage-treatment plant construction work
- 38421000 - Flow-measuring equipment
- 39350000 - Sewerage works equipment
- 45240000 - Construction work for water projects
- 45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
- 71631440 - Flow-monitoring services
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-029717
- FTS 023336-2021