Mogden STW AMP 7 Resilience

A Utilities Contract Award Notice
by THAMES WATER UTILITIES LIMITED

Source
OJEU
Type
Contract (Works)
Duration
4 year (est.)
Value
___
Sector
CONSTRUCTION
Published
18 Oct 2021
Delivery
To 18 Aug 2025 (est.)
Deadline
n/a

Concepts

Location

Mogden, Isleworth

Geochart for 2 buyers and 1 suppliers

Description

Design, construct and commission resilience works to the current Mogden Sewage Treatment Works (STW).

Total Quantity or Scope

Purpose The Contractor shall design, construct and commission a resilience scheme for the current Mogden Sewage Treatment Works (STW) to support the works to, reliably and sustainability meet its flow and quality consent for a design population equivalent (PE) projected to be 2.4 million. Including: • Improvements to the resilience and capacity of secondary treatment. • Improvements to the resilience of the Sludge and Digester Streams and prepare them for AMP8 work. The following is a summary of the project scope: • Upgrades to the Main Pumping Station to provide capacity, resilience and protection to downstream processes, including: o High Voltage (HV) and Low Voltage (LV) electrical infrastructure; • Capital maintenance work and improved process control to increase the resilience of the activated sludge plants (ASPs) including: o C Battery Blower replacement and ASP works including RAS Plant improvements, o D Battery Blower replacement, o E Battery Blower power supply. • New sludge treatment facilities to increase capacity, improve Asset reliability and provide resilience. This includes: o additional thickened sludge blending tank with odour control; o modifications to raw sludge thickening streams; o modifications to the sludge Import Facility to provide capacity in the sludge thickening stream. • Digester Modifications including capital maintenance work on mixing Plant, replacement of roofs and preparatory works for a future sludge scheme by enabling sequential primary digestion. • Replace the existing gas forwarding compressors and waste gas burner • Capital maintenance works to replace or upgrade existing HV and LV Switchboards; • Improve the resilience of the site Process Control Network • Modifications to the power management Plant and upgrade of the site SCADA (supervisory control and data acquisition) Plant • Other works to upgrade the capacity of the existing Plant for the 2026 growth scenario • The Contractor shall also be responsible for preparing and submitting the planning application on behalf of the Purchaser, if this is required for the works

Award Detail

1 Kier Infrastructure & Overseas (Salford)
  • Mogden STW AMP 7 Resilience
  • Reference: 1

Renewal Options

Please refer to the project brief.

CPV Codes

  • 45252100 - Sewage-treatment plant construction work
  • 45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
  • 71320000 - Engineering design services
  • 39350000 - Sewerage works equipment
  • 45259000 - Repair and maintenance of plant
  • 45259100 - Wastewater-plant repair and maintenance work
  • 45259900 - Plant upgrade work

Indicators

  • Options are available.
  • Award on basis of price and quality.

Reference

Domains