Mogden STW AMP 7 Resilience
A Utilities Contract Award Notice
by THAMES WATER UTILITIES LIMITED
- Source
- OJEU
- Type
- Contract (Works)
- Duration
- 4 year (est.)
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 18 Oct 2021
- Delivery
- To 18 Aug 2025 (est.)
- Deadline
- n/a
Concepts
Location
Mogden, Isleworth
2 buyers
- Thames Water Utilities Reading
1 supplier
- Kier Infrastructure & Overseas Salford
Description
Design, construct and commission resilience works to the current Mogden Sewage Treatment Works (STW).
Total Quantity or Scope
Purpose The Contractor shall design, construct and commission a resilience scheme for the current Mogden Sewage Treatment Works (STW) to support the works to, reliably and sustainability meet its flow and quality consent for a design population equivalent (PE) projected to be 2.4 million. Including: • Improvements to the resilience and capacity of secondary treatment. • Improvements to the resilience of the Sludge and Digester Streams and prepare them for AMP8 work. The following is a summary of the project scope: • Upgrades to the Main Pumping Station to provide capacity, resilience and protection to downstream processes, including: o High Voltage (HV) and Low Voltage (LV) electrical infrastructure; • Capital maintenance work and improved process control to increase the resilience of the activated sludge plants (ASPs) including: o C Battery Blower replacement and ASP works including RAS Plant improvements, o D Battery Blower replacement, o E Battery Blower power supply. • New sludge treatment facilities to increase capacity, improve Asset reliability and provide resilience. This includes: o additional thickened sludge blending tank with odour control; o modifications to raw sludge thickening streams; o modifications to the sludge Import Facility to provide capacity in the sludge thickening stream. • Digester Modifications including capital maintenance work on mixing Plant, replacement of roofs and preparatory works for a future sludge scheme by enabling sequential primary digestion. • Replace the existing gas forwarding compressors and waste gas burner • Capital maintenance works to replace or upgrade existing HV and LV Switchboards; • Improve the resilience of the site Process Control Network • Modifications to the power management Plant and upgrade of the site SCADA (supervisory control and data acquisition) Plant • Other works to upgrade the capacity of the existing Plant for the 2026 growth scenario • The Contractor shall also be responsible for preparing and submitting the planning application on behalf of the Purchaser, if this is required for the works
Award Detail
1 | Kier Infrastructure & Overseas (Salford)
|
Renewal Options
Please refer to the project brief.
CPV Codes
- 45252100 - Sewage-treatment plant construction work
- 45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
- 71320000 - Engineering design services
- 39350000 - Sewerage works equipment
- 45259000 - Repair and maintenance of plant
- 45259100 - Wastewater-plant repair and maintenance work
- 45259900 - Plant upgrade work
Indicators
- Options are available.
- Award on basis of price and quality.
Reference
- OJEU 528973-2021