Insulation and Associated Works Framework

A Tender Notice
by EFFICIENCY EAST MIDLANDS LIMITED

Source
Find a Tender
Type
Framework (Works)
Duration
4 year
Value
£950M
Sector
CONSTRUCTION
Published
15 Nov 2021
Delivery
To 14 Mar 2026 (est.)
Deadline
19 Jan 2022 13:00

Concepts

Location

North East England:

Geochart for 1 buyers and 0 suppliers

Description

Efficiency East Midlands Ltd (EEM) is a not for profit consortium which establishes and manages a range of framework and DPS agreements. Our membership has now grown to 245 public sector organisations including housing associations and ALMO's, Local Authorities, NHS trusts, Education Providers, Blue Light Services, Government Agencies and Charities. EEM have also established a formal collaboration with 3 like-minded procurement consortia - Westworks, South East Consortium and Advantage South West. The membership list for these three consortia may be obtained from the following website addresses: www.westworks.org.uk www.southeastconsortium.org.uk www.advantagesouthwest.co.uk EEM wishes to procure and enter into framework agreements with multiple Contractors for the provision of Insulation works to include; • External Wall Insulation, design, enabling and installation works. • Exterior Render Systems . • Exterior Wall Cladding Systems. • External Wall Insulation Repair and Maintenance. • Internal Wall Insulation design, enabling and installation works. • Cavity Wall Insulation (Extraction Services, Virgin and Cavity Wall Insulation Re-fill). • Retrofit Floor Insulation (solid or suspended). • Loft Insulation (virgin and re-fill). • Attic/Room in Roof Insulation. • Retrofit Energy Efficiency measures to Park Homes. • Works associated with Insulation Programmes including but not limited to windows and doors, roofing, guttering, builders and ancillary works. The framework will be tendered and awarded based on the following lot structure: Sublot 1 - Midlands Sublot 2 - East of England Sublot 3 - National Coverage Contracting Authorities can use either a Direct Selection or Mini Competition to appoint a Contractor and only the Contractors who sit on the relevant geographical sublots the Contracting Authority is looking to use can participate in the selection process. Further details and guidance on the lot structure for this framework can be located within Part A of the tender documentation.

Lot Division

1 Insulation Framework Lot 1 - Midlands
  • Value: £375M

Lot 1 is being created to support Members appoint experienced and competent Contractors to undertake Insulation programmes on behalf of EEM Members in the Midlands. The framework will provide EEM Members with a route to procure the following works: … • Exterior Render Systems. … • Retrofit Floor Insulation (Solid or Suspended). • Loft Insulation (Virgin and Re-fill). • Attic/Room in Roof Insulation . … Contractors must hold BBA accreditation and certification for insulation products. Installation of systems must be compliant with the manufacturer's instructions and latest PAS Standards. Retrofit systems must be designed to achieve U-values which satisfy or exceed current UK Building Regulation requirements. Compliance with both PAS 2030: 2019 and PAS 2035: 2019 is mandatory for all companies installing insulation via an appropriate body such as British Board of Agrément (BBA), The Insulation Assurance Authority (IAA) or equal approved body. Contractors must be able to offer a Solid Wall Insulation Guarantee Agency (SWIGA) or an equivalent work guarantee scheme guarantee for Solid Wall Insulation works and a Cavity Insulation Guarantee Agency (CIGA) or an equivalent work guarantee scheme for Cavity Wall Insulation works. Contractors must have received training and be an approved installer of the types of systems they are installing to guarantee a high standard of installation. Membership to the following associations is recommended but not a mandatory requirement. Contractors who do not hold membership to the following will not be excluded from tendering for this framework. • Retrofit Academy Centre of Excellence • National Insulation Association (NIA) • Insulated Cladding & Render Association (INCA) The following services are not an exhaustive list of services covered by Lot 1: • Access funding to enable the completion of the works on behalf of the Member. • Complete all relevant assessments and funding paperwork. • Carryout funding and grant related works to timescales associated with the funding and ensure all reported is completed in accordance with the funding and grant application requirements. • Produce EPC On the back of pre design survey. • Undertake site surveys as described below and identify per property issues associated with the installation. • As required, undertake surveys and test to include but not limited to; full structural survey/assessment of the existing dwelling, viability surveys, pull out tests. • Be responsible for the design and specification to suit various property types, supply, and installation of the system. • Manage all aspects of the planning permission process where necessary. • Notify local Building Control as required and obtain Building Regulation approval. • Notify the Member of any necessary Party Wall Act applications. • Provide copies of all of the above correspondence to the Member. • Quality assurance and compliance testing of the completed system. • Liaise with Residents on the work to be completed. • Advise on all consents and applications needed for carrying out the works. • Obtain the necessary guarantees (Ofgem approved 25 year guarantee). • Liaise with service providers where necessary. On completion of the works the Contractor will provide: • All guarantee documentation. • A statement indicating how much grant funding has been achieved. • An updated EPC certificate for each property included within the contract.

Award Criteria
Competence Assessment and Best Practise Requirements Pass/Fail
Quality Assessment 40%
EWI Property Scheme Rates 20%
EWI, Cavity and Loft Insulation Rates 15%
Scenario's 7.5%
Schedule of Rates 15%
Labour Rates 2.5%
2 Insulation Framework Lot 2 - East of England
  • Value: £125M

Lot 2 is being created to support Members appoint experienced and competent Contractors to undertake Insulation programmes on behalf of EEM Members in the East of England. The framework will provide EEM Members with a route to procure the following works: … • Exterior Render Systems. … • Internal Wall Insulation design, enabling and installation works … • Retrofit Floor Insulation (Solid or Suspended). • Loft Insulation (Virgin and Re-fill) . … Contractors must hold BBA accreditation and certification for insulation products. Installation of systems must be compliant with the manufacturer's instructions and latest PAS Standards. Retrofit systems must be designed to achieve U-values which satisfy or exceed current UK Building Regulation requirements. Compliance with both PAS 2030: 2019 and PAS 2035: 2019 is mandatory for all companies installing insulation via an appropriate body such as British Board of Agrément (BBA), The Insulation Assurance Authority (IAA) or equal approved body. Contractors must be able to offer a Solid Wall Insulation Guarantee Agency (SWIGA) or an equivalent work guarantee scheme guarantee for Solid Wall Insulation works and a Cavity Insulation Guarantee Agency (CIGA) or an equivalent work guarantee scheme for Cavity Wall Insulation works. Contractors must have received training and be an approved installer of the types of systems they are installing to guarantee a high standard of installation. Membership to the following associations is recommended but not a mandatory requirement. Contractors who do not hold membership to the following will not be excluded from tendering for this framework. • Retrofit Academy Centre of Excellence • National Insulation Association (NIA) • Insulated Cladding & Render Association (INCA) The following services are not an exhaustive list of services covered by Lot 2: • Access funding to enable the completion of the works on behalf of the Member. • Complete all relevant assessments and funding paperwork. • Carryout funding and grant related works to timescales associated with the funding and ensure all reported is completed in accordance with the funding and grant application requirements. • Produce EPC On the back of pre design survey. • Undertake site surveys as described below and identify per property issues associated with the installation. • As required, undertake surveys and test to include but not limited to; full structural survey/assessment of the existing dwelling, viability surveys, pull out tests. • Be responsible for the design and specification to suit various property types, supply, and installation of the system. • Manage all aspects of the planning permission process where necessary. • Notify local Building Control as required and obtain Building Regulation approval. • Notify the Member of any necessary Party Wall Act applications. • Provide copies of all of the above correspondence to the Member. • Quality assurance and compliance testing of the completed system. • Liaise with Residents on the work to be completed. • Advise on all consents and applications needed for carrying out the works. • Obtain the necessary guarantees (Ofgem approved 25 year guarantee). • Liaise with service providers where necessary. On completion of the works the Contractor will provide: • All guarantee documentation. • A statement indicating how much grant funding has been achieved. • An updated EPC certificate for each property included within the contract.

Award Criteria
Competence Assessment and Best Practise Requirements Pass/Fail
Quality Assessment 40%
EWI Property Scheme Rates 20%
EWI, Cavity and Loft Insulation Rates 15%
Scenario's 7.5%
Schedule of Rates 15%
Labour Rates 2.5%
3 Insulation Framework Lot 3 - National Coverage
  • Value: £450M

Lot 3 is being created to support Members appoint experienced and competent Contractors to undertake Insulation programmes on behalf of EEM Members in the Midlands. The framework will provide EEM Members with a route to procure the following works: … • Exterior Render Systems. … • Retrofit Floor Insulation (Solid or Suspended). • Loft Insulation (Virgin and Re-fill) . … Contractors must hold BBA accreditation and certification for insulation products. Installation of systems must be compliant with the manufacturer's instructions and latest PAS Standards. Retrofit systems must be designed to achieve U-values which satisfy or exceed current UK Building Regulation requirements. Compliance with both PAS 2030: 2019 and PAS 2035: 2019 is mandatory for all companies installing insulation via an appropriate body such as British Board of Agrément (BBA), The Insulation Assurance Authority (IAA) or equal approved body. Contractors must be able to offer a Solid Wall Insulation Guarantee Agency (SWIGA) or an equivalent work guarantee scheme guarantee for Solid Wall Insulation works and a Cavity Insulation Guarantee Agency (CIGA) or an equivalent work guarantee scheme for Cavity Wall Insulation works. Contractors must have received training and be an approved installer of the types of systems they are installing to guarantee a high standard of installation. Membership to the following associations is recommended but not a mandatory requirement. Contractors who do not hold membership to the following will not be excluded from tendering for this framework. • Retrofit Academy Centre of Excellence • National Insulation Association (NIA) • Insulated Cladding & Render Association (INCA) The following services are not an exhaustive list of services covered by Lot 3: • Access funding to enable the completion of the works on behalf of the Member. • Complete all relevant assessments and funding paperwork. • Carryout funding and grant related works to timescales associated with the funding and ensure all reported is completed in accordance with the funding and grant application requirements. • Produce EPC On the back of pre design survey. • Undertake site surveys as described below and identify per property issues associated with the installation. • As required, undertake surveys and test to include but not limited to; full structural survey/assessment of the existing dwelling, viability surveys, pull out tests. • Be responsible for the design and specification to suit various property types, supply, and installation of the system. • Manage all aspects of the planning permission process where necessary. • Notify local Building Control as required and obtain Building Regulation approval. • Notify the Member of any necessary Party Wall Act applications. • Provide copies of all of the above correspondence to the Member. • Quality assurance and compliance testing of the completed system. • Liaise with Residents on the work to be completed. • Advise on all consents and applications needed for carrying out the works. • Obtain the necessary guarantees (Ofgem approved 25 year guarantee). • Liaise with service providers where necessary. On completion of the works the Contractor will provide: • All guarantee documentation. • A statement indicating how much grant funding has been achieved. • An updated EPC certificate for each property included within the contract.

Award Criteria
Competence Assessment and Best Practise Requirements Pass/Fail
EWI Property Scheme Rates 20%
EWI, Cavity and Loft Insulation Rates 15%
Scenario's 7.5%
Schedule of Rates 15%
Labour Rates 2.5%

CPV Codes

  • 45320000 - Insulation work
  • 45210000 - Building construction work
  • 45261410 - Roof insulation work
  • 45262650 - Cladding works
  • 45262700 - Building alteration work
  • 45421100 - Installation of doors and windows and related components
  • 45421110 - Installation of door and window frames

Indicators

  • Restrictions apply to the lot award allocation.
  • This is a one-off contract (no recurrence)
  • Renewals are not available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** The call-off contracts to be awarded pursuant to the framework agreements to be entered at conclusion of the procurement exercise may extend for a duration of up to 5 years beyond expiry of the 4-year framework term. Please note that the total potential framework value stated within this notice is in relation to the full 4-year framework and takes into consideration the lot structure, length of call off contracts and that the EEM membership may grow over the framework lifetime . Where the contract notice states a maximum of suppliers to be appointed this is the maximum for the Framework. EEM intend on appointing up to 8 Contractors to each of the 3 framework lots and we reserve the right to appoint less than the numbers stated. This framework is being procured by Efficiency East Midlands Ltd (EEM) on behalf of their members and the other organisations described below as being authorised users. The following contracting authorities will be entitled to agree and award contracts under this framework agreement as Authorised Users: 1) any Member of EEM which for the avoidance of doubt currently includes 3 partner consortia - Westworks(www.westworks.org.uk), Advantage South West (www.advantagesouthwest.co.uk) and South East Consortium (www.southeastconsortium.org.uk). A full list of current members is available at www.eem.org.uk . 2) any future member of EEM or our partner consortia and in all cases being an organisation which has applied to join EEM or our partner consortia in accordance with the applicable constitutional documents; 3) An EEM participant being an organisation which is neither a current or EEM member (as defined at 1 above) nor a future member of EEM (as defined at 2 above). Further details regarding the authorised users of this framework can be found in the ITT documents. To respond to this tender or review the documentation, please follow the below listed steps. 1) Go to the portal https://xantive.supplierselect.com 2) If you need to register a new account follow the prompts to register your organisation for a Xantive account. 3) When you sign in select 'Public Projects' from the menu (top right). A list of all open tenders will be displayed. 4) Select 'EEM0046 Insulation Framework' from the list of projects and then 'Create Opportunity'. That will give you access to the basic information. 5) Click 'Accept Opportunity' to get more detail including all clarification logs. There is no obligation to submit a response. 6) If you do wish to submit a response, do so before the deadline by changing the status to submitted. You will only be allowed to submit if every mandatory question is answered. Please follow the portal support guide provided with the tender pack when submitting your bid.

Reference

Domains