Torness to Hawthorn Pit HVDC Link

A Tender Notice
by NATIONAL GRID ELECTRICITY TRANSMISSION PLC

Source
Find a Tender
Type
Contract (Works)
Duration
4 year
Value
£2B-£924M
Sector
CONSTRUCTION
Published
02 Feb 2022
Delivery
To 26 Apr 2028 (est.)
Deadline
04 Mar 2022 12:00

Concepts

Location

United Kingdom: UK and UK territorial waters

Geochart for 2 buyers and 0 suppliers

Description

National Grid Electricity Transmission PLC (NGET) and SP Transmission PLC (SPTN) (the "Employers") are jointly developing a HVDC link between Torness, Scotland and Hawthorn Pit, England (the "HVDC Link"). This notice concerns the award of one or more Engineering, Procurement & Construction (EPC) contracts for the detailed design, engineering, procurement, manufacture, installation, construction, testing, commissioning, spares provision, operational hand-over and maintenance of the HVDC Link between Scotland and England. The procurement is structured in 3 Lots consisting of:  Lot 1 - EPC of HVDC, Voltage Source Commutated (VSC) converter stations at both Torness and Hawthorn Pit and HVAC underground cable at Hawthorn Pit between Converter Station and Point of Common Connection (PCC).  Lot 2 - EPC of HVDC submarine and underground cable between converter stations at both Torness and Hawthorn Pit including HVAC underground cable at Torness between converter station & Point of Common Connection (PCC).  Lot 3 - A single contract (Turnkey) for both the converter stations and the submarine & underground cabling works.

Lot Division

1 EPC of HVDC Voltage Source Commutated (VSC) converter stations at both Torness & Hawthorn Pit and HVAC underground cable at Hawthorn Pit between Converter Station and Point of Common Connection (PCC)
  • Value: £444M

EPC of two HVDC VSC converter stations (England and Scotland), including the underground civils works, to accommodate x2 HVDC cable poles over a total route length of approximately 196 km, forming a connection and capable of delivering 2GW as more fully described in the procurement documents. Applicants' submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the HVDC Link by Q4 2027. Submissions must also include EPC of HVAC cable between the converter station and PCC at Hawthorn Pit only. The submission must include interfaces (as defined in the procurement documents) between adjacent cable and converter equipment, allowing interconnection of a final end-to-end solution. The contract will also include a warranty and maintenance period. The Employers are considering both a 2GW 2 Cable 525kV solution and a 1.4GW-1.6GW solution. Given the differences in the specification it is proposed to sub-divide Lot 2 to consider these alternative proposals. In the event that the cable capacity is reduced to 1.4 - 1.6GW, the appointed Lot 1 contractor may be required to modify its proposal on the converter station to meet the capability of the selected cable technology solution. The Employers envisage taking up to a maximum of three (3) Applicants on Lot 1 through to RfP stage. For the purpose of awarding the contracts, the Employers may enter into joint venture arrangements. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful Applicant(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured. As part of the contract award process, the Employers are considering the potential to award early works ahead of entering into the main EPC contract.

2 EPC of HVDC submarine and underground cable between converter stations (Torness & Hawthorn Pit) inc. HVAC underground cable at Torness between converter station & Point of Common Connection (PCC).
  • Value: £480M

EPC of two HVDC cable poles (underground and submarine cable), including the underground civils works, over a total route length of approximately 196 km, forming part of a connection between two HVDC converter stations (England and Scotland) and capable of delivering 2GW (Lot 2A) or 1.4GW - 1.6GW (Lot 2B). Applicants' submissions must also include EPC of HVAC cable between the converter station and PCC at Torness only. Applicants' submissions must include interfaces (as defined in the procurement documents) between adjacent cable & converter equipment, allowing interconnection of a final end-to-end solution. Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the HVDC Link by Q4 2027. The contract will also include a warranty and maintenance period. The proposed HVDC cable technology is 525kV XLPE, PPL or MIND. Proposed PPL and MIND cable systems (cables and accessories, including factory joints and transition joints) shall be type tested in accordance with Cigre Electra 189 and 171 before the award of the contract. Proposed XLPE cable systems (cables and accessories, including factory joints and transition joints) shall be PQ tested in accordance with CIGRE TB852 or TB496 before the award of the contract. The Employers envisage taking up to a maximum of twelve successful Applicants - a maximum of six (6) on Lot 2A and six (6) on Lot 2B - (in accordance with the procurement documents) through to RfP stage. For the purpose of awarding the contracts, the Employers may enter into joint venture arrangements. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful applicant(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured. As part of the contract award process, the Employers are considering the potential to award early works ahead of entering into the main EPC contract.

3 A single contract (Turnkey)
  • Value: £924M

EPC of Two HVDC VSC converter stations (England and Scotland), including the underground civils works, to accommodate x2 HVDC cable poles over a total route length of approximately 196 km, forming a connection and capable of delivering 2GW as more fully described in the procurement documents. EPC of two HVDC cable poles (underground and submarine cable), including the underground civils works, over a total route length of approximately 196 km, forming part of a connection between two HVDC converter stations (England and Scotland) and capable of delivering 2GW or 1.4 - 1.6GW. Applicants' submissions must also include EPC of HVAC cable between the converter station and PCC at Torness and Hawthorn Pit. The submission must include interfaces (as defined in the procurement documents) between adjacent cable and converter equipment, allowing interconnection of a final end-to-end solution. The contract will also include a warranty and maintenance period. The HVDC cable technology is 525kV XLPE, PPL or MIND. Proposed PPL and MIND cable systems (cables and accessories, including factory joints and transition joints) shall be type tested in accordance with Cigre Electra 189 and 171 before the award of the contract. Proposed XLPE cable systems (cables and accessories, including factory joints and transition joints) shall be Pre-Qualification tested in accordance with CIGRE TB852 or TB496 before the award of the contract. Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the HVDC Link by Q4 2027. Please note that the constituent parts of any joint venture or consortium Applicant participating in Lot 3 will be expected also to participate in Lot 1 and Lot 2. The Employers envisage taking up to a maximum of three (3) Applicants on Lot 3 through to RfP stage. For the purpose of awarding the contracts, the Employers may enter into joint venture arrangements. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful applicant(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured. As part of the contract award process, the Employers are considering the potential to award early works ahead of entering into the main EPC contract.

CPV Codes

  • 45000000 - Construction work
  • 31200000 - Electricity distribution and control apparatus
  • 31321300 - High-voltage cable
  • 45231400 - Construction work for electricity power lines
  • 45314310 - Installation of cable laying
  • 31321500 - Submarine cable

Indicators

  • Restrictions apply to the lot award allocation.
  • This is a one-off contract (no recurrence)
  • Options are available.
  • Renewals are not available.
  • Professional qualifications are sought.
  • Staff qualifications are relevant.
  • Technical restrictions apply.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** For the purpose of awarding the contracts, the Employers may enter into joint venture arrangements. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful contractor(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured. The Employers reserve the right to withdraw this notice or any of the Lots included in this notice at any time for whatever reason. In the event that the Employers decide to withdraw any Lots within this notice, the Employers reserve the right to continue the process in respect of any of the remaining Lots. Applicants shall be fully responsible for the costs of responding to this procurement at all stages of the procurement and in no circumstances do the Employers accept any liability for any costs incurred by any Applicants, howsoever or whensoever incurred.