CPF1956-20 Resurfacing, Reconstruction, Patching, Recycling and High Friction Surfacing (HFS) Framework 2022 – 2026

A Addendum Notice
by DEVON COUNTY COUNCIL

Source
Find a Tender
Type
Contract (Works)
Duration
not specified
Value
___
Sector
CONSTRUCTION
Published
15 Mar 2022
Delivery
not specified
Deadline
n/a

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Resurfacing, Reconstruction, Patching, Recycling and High Friction Surfacing (HFS) Framework 2022 – 2026. The Framework will have 3 lots: Lot 1 - Is County wide (based on Area East with uplifts (positive or negative) for work in Areas North and South) and it consists of the resurfacing and reconstruction and patching of carriageways, associated works and the disposal of arisings to licenced or approved facilities for either future re-use/recycling or disposal (no re-use/recycling of arisings in the works). Lot 2 - Is County wide (based on Area East with uplifts (positive or negative) for work in Areas North and South) and it consists of hand patching, the installation of High Friction Surfacing (HFS), patching of existing HFS installations and associated works. Lot 3 - Is County wide (based on Area East with uplifts (positive or negative) for work in Areas North and South) and it consists of the resurfacing and reconstruction of carriageways, associated works and the use of recycled materials either In-situ Cold Recycled Bitumen Bound (shallow depth (Retread), medium depth (Regen) and deep depth) or Ex-situ Cold Recycled Bitumen Bound (processing plant).

Ammendments to Previous Notice

2. Time limit for receipt of tenders or requests to participate

Wed Mar 16 23 12:00:00 2022

CPV Codes

  • 45233000 - Construction, foundation and surface works for highways, roads

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains