MFF108 2020-2024 Grip, Gully Blocking and Re-profiling Framework Agreement Lot 12
A Contract Award Notice
by PEAK DISTRICT NATIONAL PARK AUTHORITY
- Source
- OJEU
- Type
- Contract (Works)
- Duration
- 4 year (est.)
- Value
- £32K
- Sector
- CONSTRUCTION
- Published
- 21 Mar 2022
- Delivery
- 01 Aug 2020 to 31 Jul 2024 (est.)
- Deadline
- n/a
Concepts
Location
Bakewell
1 buyer
1 supplier
Description
The objective of this contract is the supply, transportation, and construction of stone, timber, plastic, heather bale and natural fibre log dams in gully systems on restoration work sites around the Peak District and South Pennines SAC. It also includes the construction of peat dams, peat bunds and the re-profiling of hag/gully sides.
Total Quantity or Scope
The supply, transportation, and construction of stone, timber, plastic, heather bale and natural fibre log dams in gully systems on restoration work sites around the Peak District and South Pennines SAC. It also includes the construction of peat dams, peat bunds and the reprofiling of hag/gully sides. The Works include the following sub objectives: 1) The call-off of temporary Trackway at the designated lift sites to store and prepare materials for airlifting and supervising Trackway installation. 2) The supply of gully blocking materials for the works and coordinating and receiving deliveries of gully blocking materials to the lift sites and delivery sites. 3) Preparation of gully blocking materials for transportation at the lift sites/delivery sites. 4) The Transportation of materials to the works sites by helicopter is subject to a separate contract held by the Authority. the contractor will need to liaise with the Authority’s airlifting contractor to co-ordinate the airlifting of materials and provide all Marshalls required for the Airlifting of Materials. 5) The construction of dams in gully systems at the work sites to the standard specified by the Authority. 6) Providing a GPS record of the constructed dams to the Authority upon completion. Work details GB type number (dams) number (units) Stone 129 137 Timber 106 111 Heather bale 75 176 Peat Dams 300 300
Award Detail
1 | Environmental Land Management Solutions (Alfreton)
|
Award Criteria
Provision of evidence detailing previous relevant experience and a methodology detailing how you will meet the Contract Objectives and Specifications | 40.0 |
PRICE | 60.0 |
CPV Codes
- 45247200 - Construction work for dams and similar fixed structures
Indicators
- Award on basis of price and quality.
Reference
- OJEU 148105-2022