NeuConnect HVDC Interconnector
A Utilities Contract Award Notice
by NEUCONNECT BRITAIN LIMITED
- Source
- OJEU
- Type
- Contract (Works)
- Duration
- 13 year (est.)
- Value
- ___
- Sector
- INDUSTRIAL
- Published
- 06 Apr 2022
- Delivery
- 31 Dec 2020 to 31 Dec 2033 (est.)
- Deadline
- n/a
Concepts
Location
London
3 buyers
- Neuconnect Britain London
- Neuconnect Deutschland Berlin
1 supplier
- Unnamed None
Description
The NeuConnect interconnector will be the first UK to Germany interconnector. It will connect and facilitate power between the UK transmission system at the Isle of grain and the German transmission system near Wilhelmshaven. The interconnector, which is sized at 1400MW (receiving end) to take advantage of provendesign and technology, has a cable route of approximately 720 km that routes through UK, Netherlands and German territorial waters before making landfall at either end. It comprises cables of equal size and capacity intended to operate at opposite polarity in a bi-pole configuration. At the UK end the land route isless than 2 km whilst on the German side there is a route of approximately 18 km to the converter site. It is envisaged that there will need to be a single survey,maintenance, emergency response and repair contract for the cable and a separate contract for the converter operation and maintenance.
Total Quantity or Scope
HVDC Cables cables approx. length 720 km (rated voltage 525kV, 1400MW export delivery at AC connection point), supply, install, test, commission and maintenance.
Award Detail
1 | Unnamed (None) |
CPV Codes
- 45231400 - Construction work for electricity power lines
- 31321300 - High-voltage cable
- 31321500 - Submarine cable
- 50711000 - Repair and maintenance services of electrical building installations
Indicators
- Award on basis of price and quality.
Reference
- OJEU 181802-2022