Boundary Layer Wind Tunnel Control Panel

A Tender Notice
by UNIVERSITY OF BRISTOL

Source
Contracts Finder
Type
Contract (Products)
Duration
16 month
Value
£50K
Sector
CONSTRUCTION
Published
27 Apr 2022
Delivery
01 Jun 2022 to 30 Sep 2023
Deadline
19 May 2022 10:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Control Panel for the Boundary Layer Wind Tunnel located in the Hele-Shaw lab within the Faculty of Engineering. The new Boundary Layer Wind Tunnel facility (BLWT) at the Faculty of Engineering, University of Bristol (UoB), is a multi-purpose state-of-the-art facility and designed to enable a wide range of high-quality aerodynamic research. The system is a classical wind tunnel: A controlled series of fans, pushing air around a closed structure to achieve desired wind speeds. When completed the BLWT will be used as an experimental piece of research equipment.

CPV Codes

  • 45220000 - Engineering works and construction works

Indicators

  • Contract is suitable for SMEs.

Reference

Domains