Enabling Works Package
A Pipeline Notice
by CRAIG PULLEN CONSULTING
- Source
- Contracts Finder
- Type
- Potential Contract ()
- Duration
- 0.5 year
- Value
- £498K
- Sector
- CONSTRUCTION
- Published
- 08 Jun 2022
- Delivery
- 25 Jul 2022 to 20 Jan 2023
- Deadline
- n/a
Concepts
Location
1 buyer
- Craig Pullen Consulting Milton Keynes
Description
Program - Works to be carried out between 25 July 2022 and 20/01/23 [26 weeks]. It should be noted that the temporary/permanent deck element of the building project must be completed by 20 August 2022. Location - Atrium and adjacent plant room areas at Milton College; Chaffron Way Campus Woughton Campus West, Leadenhall, MK6 5LP. Works - to install a temporary [or permanent] crash deck floor above the second-floor gantry level of the atrium; to install a sacrificial waterproof deck on the floor and install guttering & storm water drainage; to form a new access to the plantrooms/floor; strip out redundant ventilation plant; new plant room works; removal of the atrium glazing; pigeon protection works. Contract/procurement - Single stage contract traditional IFC JCT contract with contractor's design portion. Tender period - 20 June 2022 - 15 July 2022 Consultant team - Client Representative/Project Manager - Project Management Solutions; Architect/Principal Designer - Devonshire Architects; Structural Consultant - SOLUTION CE; M&E Consultant - Panda CE; Approved Inspector - LEXICON
Total Quantity or Scope
YEAR: 2022/2023; BUDGET: 497,620.00
CPV Codes
- 45214300 - Construction work for college buildings
Indicators
- Contract is suitable for SMEs.
Other Information
Contact Craig Pullen (craig@cpconsulting.org.uk) to express an interest
Reference
- MKC - Enabling
- CF 861c1fcc-f3f2-4bb1-8f56-2f222f68d9e2