HyNet North West Hydrogen Pipeline Engineering, Procurement, Construction & Commissioning (EPCC) Contract
A Prior Information Notice
by CADENT GAS LIMITED
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- not specified
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 28 Jul 2022
- Delivery
- not specified
- Deadline
- n/a
Concepts
- construction work
- hynet north west hydrogen pipeline engineering, procurement, construction & commissioning
- coventry
- per cent hydrogen pipeline
- 125km of underground hp steel pipeline
- hynet north west hydrogen pipeline
- hydrogen
- detailed design engineering
- hydrogen transportation network
- commissioning of the hynet phase
Location
Greater Manchester: North West England
1 buyer
- Cadent Gas Coventry
Description
The HyNet North West Hydrogen Pipeline will be Cadent's first 100 per cent hydrogen pipeline. The pipeline forms part of the wider HyNet scheme, whose primary objective is to reduce the regional CO2 omissions. The pipeline will provide a hydrogen transportation network required to enable the UK's first fully integrated hydrogen supply system It is anticipated that there will be approximately 125km of underground HP steel pipeline and associated lower pressure spurs and Hydrogen Above Ground Installations (HAGI's). The pipeline is considered a National Significant Infrastructure Project (NSIP) and shall be delivered in line with the, to be submitted (by others), Development Consent Order (DCO). The project will deliver Phase 2 of the hydrogen network and is designed to enable early adopters to receive hydrogen and interlinks with hydrogen production and storage facilities. Cadent is looking to identify a single entity (JV / Consortium) to deliver the full EPCC scope
Total Quantity or Scope
Secure a contractor entity who has the capability and ownership to undertake the detailed design engineering, procurement, construction and commissioning of the HyNet Phase 2 Project, including delivery in line with the DCO submission. Additional information: Further information on the project and the interactive route corridor map can be found at:
CPV Codes
- 45255000 - Construction work for the oil and gas industry
- 24111600 - Hydrogen
- 44161100 - Gas pipelines
- 44161110 - Gas-distribution network
- 44161500 - High-pressure pipeline
- 44161600 - Low-pressure pipeline
- 45210000 - Building construction work
- 45220000 - Engineering works and construction works
- 71322200 - Pipeline-design services
- 71340000 - Integrated engineering services
- 71510000 - Site-investigation services
- 71520000 - Construction supervision services
- 71540000 - Construction management services
Other Information
Further information on the project and the interactive route corridor map can be found at: https://www.hynethydrogenpipeline.co.uk/ ** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-0356e3
- FTS 020611-2022