Construction and Trades Sub Contractor Framework
A Tender Notice
by CITY BUILDING (GLASGOW) LLP
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- 4 year
- Value
- £-£500M
- Sector
- CONSTRUCTION
- Published
- 18 Aug 2022
- Delivery
- To 12 Sep 2026 (est.)
- Deadline
- 03 Oct 2022 11:00
Concepts
Location
Glasgow, Central Belt of Scotland, Dumfries & Galloway
2 buyers
- City Building Glasgow Glasgow
- City Building Contracts Glasgow
Description
Establishment of a multi-lot framework agreement for the provision of construction and trades-related disciplines.
Lot Division
1 | Groundworks Works specific to this Lot may include (but not limited to) the following: Bulk Earthworks General groundworks Foundations Drainage installations Tar Works Landscaping Concrete works Specialist foundation solutions Retaining Walls External Works Award Criteria
| ||||
2 | Ground Improvements Works involved within this Lot may include (but not limited to the following): Cast in place concrete piling Preformed concrete piling Steel piling Underpinning Grouting Remediation Soil stabilisation Award Criteria
| ||||
3 | Structural Steelwork Works involved within this Lot may include (but not limited to the following): Structural steel framing Structural aluminium framing Isolated structural metal members General metalwork All steelwork manufactured must be to ISO3834 standard & carry the CE mark Award Criteria
| ||||
4 | Blacksmith / Metalwork Works involved within this Lot may include (but not limited to the following): Architectural Fencing and Gates. Weldmesh Fencing and Gates. Specialist Metalworks. Balustrades, handrails etc Metal access ramps Award Criteria
| ||||
5 | Insitu Concrete Works Works involved within this Lot may include (but not limited to the following): Reinforced Structural Concrete. Formwork. Insitu Concrete. Reinforcement. Formwork Award Criteria
| ||||
6 | Building Management Services Works involved within this Lot may include (but not limited to the following): BMS design, supply, install, commission - Building Management Systems. Electronic Control Systems. Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
7 | Precast Concrete Works involved within this Lot may include (but not limited to the following): Structural Reinforced Concrete. Concrete Flooring Systems. Precast slabs, precast stairs, precast wall panels Award Criteria
| ||||
8 | Timber Erection Kit Works involved within this Lot may include (but not limited to the following): Carpentry/Timber framing. First Fixing. Prefabricated timber unit decking. Timber Kit Erection Timber infill panels Roof trusses Floor Joists Award Criteria
| ||||
9 | Environmental Works Works involved within this Lot may include (but not limited to the following): Timber fencing. Timber gates. Timber hoarding. Soft Landscaping etc Hard Landscaping etc Award Criteria
| ||||
10 | Brickwork / Blockwork / Builderwork Works involved within this Lot may include (but not limited to the following): Brick/Block walling. Glass block walling. Masonry Work. Lintels. General builders work Slappings etc Award Criteria
| ||||
11 | Stone Masonry Works involved within this Lot may include (but not limited to the following): Natural stone rubble walling. Natural stone ashlar walling/dressings. Cast stone walling/dressings. Stone repairs Award Criteria
| ||||
12 | Fire Protection Works involved within this Lot may include (but not limited to the following): Intumescent painting. Insulating sheets/quilts/boards. Fire proofing partitions/ wall and floor penetrations Bidders must provide evidence of FIRAS Accreditation Award Criteria
| ||||
13 | Fire Sprinkler Systems Works involved within this Lot may include (but not limited to the following): Sprinkler Pipework. Sprinkler Tanks. Life safety systems Award Criteria
| ||||
14 | Dry Risers Works involved within this Lot may include (but not limited to the following): Dry Risers Award Criteria
| ||||
15 | Mechanical and Electrical Works Works involved within this Lot may include (but not limited to the following): Plumbing Heating Ventilation Gas Installations Sanitaryware BMS Trace Heating Air Conditioning Electrical installations Power Data IT Bidders must provide evidence of NICEIC or SELECT Bidders must provide evidence of GAS SAFE Award Criteria
| ||||
16 | Traditional Roofing Works involved within this Lot may include (but not limited to the following): Clay/concrete roof tiling. Fibre cement slating. Natural slating. Award Criteria
| ||||
17 | Specialist Roof Coverings Works involved within this Lot may include (but not limited to the following): Felt roof coverings. Single layer plastic roof coverings. Proprietary roof coverings. Metal Roofing Award Criteria
| ||||
18 | Lightning Protection Works involved within this Lot may include (but not limited to the following): Lightning Protection Systems. Award Criteria
| ||||
19 | External Cladding Works involved within this Lot may include (but not limited to the following): Patent glazing. Plastics profiled sheet cladding. Structural glass assemblies. Rigid sheet cladding. Timber weatherboarding. Metal profiled sheet cladding. Natural stone cladding. Award Criteria
| ||||
20 | Plasterwork Works involved within this Lot may include (but not limited to the following): Plastering. Specialist Plastering Works. Ames Taping Award Criteria
| ||||
21 | Ames Taping & Painting Works involved within this Lot may include (but not limited to the following): General Decoration Works. Internal and External Painting. Ames taping. Award Criteria
| ||||
22 | Suspended Ceilings Works involved within this Lot may include (but not limited to the following): Suspended ceilings. General ceiling installations Miscellaneous joinery works Award Criteria
| ||||
23 | Electrical Work - Domestic/Residential Works involved within this Lot may include (but not limited to the following): Domestic Electrical Installations/Upgrades. Re-Wiring. Maintenance. Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
24 | Electrical Work Commercial Works involved within this Lot may include (but not limited to the following): Commercial Electrical Installations. Standard Wire Armour. Containment. Lighting and Power Systems. Bidders must provide evidence NICEIC or SELECT Award Criteria
| ||||
25 | Heating and Plumbing Work Works involved within this Lot may include (but not limited to the following): Rainwater pipework/gutters. Foul drainage above ground. Pipelines & ancillaries. Boiler Installations. Sanitaryware. Water Services. Heating Services. Bidders must provide evidence of GAS SAFE Award Criteria
| ||||
26 | Heating and Plumbing Insulation Works involved within this Lot may include (but not limited to the following): Pipeline insulation. Ductline insulation. Award Criteria
| ||||
27 | Core Cutting Works involved within this Lot may include (but not limited to the following): Core Cutting. Award Criteria
| ||||
28 | Mastic Pointing Works involved within this Lot may include (but not limited to the following): Internal sealants. External sealants. Award Criteria
| ||||
29 | Curtain Walling Works involved within this Lot may include (but not limited to the following): Curtain walling. Rainscreen Cladding. Cladding Systems. Award Criteria
| ||||
30 | Glazing Work Works involved within this Lot may include (but not limited to the following): General Glazing. Manifestations to glazing. Award Criteria
| ||||
31 | Solar PV Works involved within this Lot may include (but not limited to the following): Solar PV Works & Associated Electrical Works. Award Criteria
| ||||
32 | Air Source Pumps Works involved within this Lot may include (but not limited to the following): Air Source Heat Pumps & Associated Systems (i.e. Underfloor heating etc) Bidders must provide evidence of Micro generation Certification Scheme Award Criteria
| ||||
33 | Other Micro Renewables Works involved within this Lot may include (but not limited to the following): Biomass Installations. Wind Energy Installations. Hydro Energy Installations. Air Source Heat Pumps Electric charging points Ground source heat pumps MVHR Solar Thermal Battery storage Bidders must provide evidence of Microgeneration Certification Scheme (MCS) or equivalent Award Criteria
| ||||
34 | Ceramic Tiling Works involved within this Lot may include (but not limited to the following): Stone tiling. Concrete tiling. Quarry tiling. Ceramic tiling. Terrazzo tiling/in situ terrazzo. Mosaic tiling. Award Criteria
| ||||
35 | Carpet & Vinyl Floor Finishes Works involved within this Lot may include (but not limited to the following): Vinyl flooring. Carpet tiling. Edge fixed carpeting. Rubber/Plastics/Cork/Lino sheeting. Award Criteria
| ||||
36 | Joinery Works involved within this Lot may include (but not limited to the following): General Joinery works Plaster boarding Metal framed partitions & ceilings Timber partitions Internal doors External doors and windows Internal Staircases Kitchen Installations IPS toilet cubicles Ironmongery Award Criteria
| ||||
37 | Curtains and Blinds Works involved within this Lot may include (but not limited to the following): Curtains. Blinds. Award Criteria
| ||||
38 | Timber Floor Finishes Works involved within this Lot may include (but not limited to the following): Timber board flooring/sheating/linings/casings. Timber narrow strip flooring/linings. Wood block/composition block/parquet flooring. Award Criteria
| ||||
39 | TV Systems Works involved within this Lot may include (but not limited to the following): Ariel Installations. Award Criteria
| ||||
40 | IT / Communications Installations Works involved within this Lot may include (but not limited to the following): Data Cabling. IT hub Installations. Secondary Electrical Containment Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
41 | Structural Metal Decking Works involved within this Lot may include (but not limited to the following): Metal profiled sheet decking. Award Criteria
| ||||
42 | Roller Shutter Doors Works involved within this Lot may include (but not limited to the following): Roller Shutters. Electrical Controls. Award Criteria
| ||||
43 | Soft Play Surfacing & Equipment Works involved within this Lot may include (but not limited to the following): Playpark Equipment. Soft Play Surfacing. Award Criteria
| ||||
44 | Asbestos Removal Works involved within this Lot may include (but not limited to the following): Asbestos Removal. Asbestos Encapsulation. Bidders must provide evidence of Licence with Asbestos Licensing Unit (ALU) Award Criteria
| ||||
45 | Scaffolding Works involved within this Lot may include (but not limited to the following): Scaffolding Installations. Tube & Fitting Scaffolding Single/ Double Scaffolding Cantilever/ Suspended Scaffolding Scaffolding Design Services All of the above can be within fast reactive Repairs and Maintenance, within External Refurbs and within Construction Works Award Criteria
| ||||
46 | Lift Installation Works involved within this Lot may include (but not limited to the following): Lifts. Escalators. Specialist moving platforms. Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
47 | Mechanical Works Works involved within this Lot may include (but not limited to the following): Plumbing Heating Ventilation Gas Installations Sanitaryware BMS Trace Heating Air Conditioning Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
48 | Artificial Pitch Works Works involved within this Lot may include (but not limited to the following): Artificial sportsground surfaces. Award Criteria
| ||||
49 | Air Conditioning Works involved within this Lot may include (but not limited to the following): Air Conditioning Systems. Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
50 | Commercial Catering Equipment Works involved within this Lot may include (but not limited to the following): Commercial Kitchen Installations. Award Criteria
| ||||
51 | Rot Works Works involved within this Lot may include (but not limited to the following): Dry Rot Works Wet Rot Works. Woodworm Works. Award Criteria
| ||||
52 | Specialist Adaptations Works involved within this Lot may include (but not limited to the following): Bathroom Adaptions. Access Adaptions. Kitchen Adaptions. Award Criteria
| ||||
53 | Concrete Repair Works Works involved within this Lot may include (but not limited to the following): Concrete Repair Works. Award Criteria
| ||||
54 | Flues / Chimney Works Flues Chimneys Flue Lining Award Criteria
| ||||
55 | Lead Work Works involved within this Lot may include (but not limited to the following): Lead Works. Award Criteria
| ||||
56 | Screeding Works Works involved within this Lot may include (but not limited to the following): Dry Screeding. Wet Screeding. Award Criteria
| ||||
57 | Specialist / Bespoke Joinery Works involved within this Lot may include (but not limited to the following): Specialist Joinery Works. Bespoke Joinery Works. Award Criteria
| ||||
58 | Public Address & Sound Systems Works involved within this Lot may include (but not limited to the following): Public Address Systems. Sound Systems. Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
59 | Stage Lighting Works involved within this Lot may include (but not limited to the following): Stage Lighting Systems. Bidders must provide evidence NICEIC or SELECT Award Criteria
| ||||
60 | Induction Loop Works involved within this Lot may include (but not limited to the following): Induction Loop Systems. Award Criteria
| ||||
61 | Ventilation Works involved within this Lot may include (but not limited to the following): General air ductlines & ancillaries. Bidders must provide evidence of Gas Safe Award Criteria
| ||||
62 | Heating & Ventilation Works involved within this Lot may include (but not limited to the following): Heating Installations. Ventilation Installations. Bidders must provide evidence of NICEIC or SELECT Bidders must provide evidence of Gas Safe Award Criteria
| ||||
63 | Smoke Ventilation & Actuators Works involved within this Lot may include (but not limited to the following): Smoke Ventilation Installations and Control Systems. AoV’s Installations and Control Systems. Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
64 | Underfloor Heating Works involved within this Lot may include (but not limited to the following): Underfloor Heating Installations. Award Criteria
| ||||
65 | Trace Heating Works involved within this Lot may include (but not limited to the following): Trace Heating Installations. Bidders must provide evidence of NICEIC or SELECT Award Criteria
| ||||
66 | Integrated Plumbing Systems Works involved within this Lot may include (but not limited to the following): Adjustable Steel Frame Installation. Decorative Removable Panel Installation. Sanitaryware Installation. Award Criteria
| ||||
67 | Commissioning Plumbing & Heating Commissioning works Bidders must provide evidence of Gas Safe Award Criteria
| ||||
68 | Ground Investigation Works Works involved within this Lot may include (but not limited to the following): Site Investigation Works. Award Criteria
| ||||
69 | Multi Utility Installations Works involved within this Lot may include (but not limited to the following): Gas Installations. Water Installations. Sewer Installations. Electrical Installations. Award Criteria
| ||||
70 | Cleaning Works/Pest Control Works involved within this Lot may include (but not limited to the following): Internal Cleaning. Façade Cleaning. Environmental clean. Pest control. Award Criteria
| ||||
71 | Demolition Work Works involved within this Lot may include (but not limited to the following): Demolition Works. Bidders must provide evidence of National Federation of Demolition Contractors or Equivalent Award Criteria
| ||||
72 | Alarms Installation including Fire, Intruder, Access and CCTV Works involved within this Lot may include (but not limited to the following): Fire Alarms. Intruder Alarms. Disabled Refuge Alarms. Disabled Toilet Alarms. Door Entry Systems. CCTV Systems. Bidders must provide evidence of BAFE SP203-1 – Fire Alarm Design NSI Gold – For Fire Systems NSI Nacoss Gold – For Security Systems Award Criteria
| ||||
73 | Multi Trade Works (Internal Core Trades) Works involved within this Lot may include (but not limited to the following): Joinery Works. Mechanical Works. Electrical Works. Builder Works. Award Criteria
| ||||
74 | Controlled Entry Installations Works involved within this Lot may include (but not limited to the following): Full Installation of Controlled Entry Systems including Pac token systems, Key systems & wireless systems Installation, where required, of door sets to reflect client’s demands Repair & maintenance of existing Systems including, door panels, control panels, handsets and wiring. Bidders must provide evidence NICEIC or SELECT Award Criteria
| ||||
75 | External Render Works Works involved within this Lot may include (but not limited to the following): Plastered coatings. Rendered coatings. Roughcast coatings. Resin bound mineral coatings. Specialist waterproof rendering. Insulation with rendered finish. Sprayed mineral fibre coatings. Metal mesh lathing/Anchored reinforcement for plastered coating. Award Criteria
| ||||
76 | Gas Servicing Works involved within this Lot may include (but not limited to the following): Gas Fire Servicing. Boiler Servicing. Bidders must provide evidence of Gas Safe Award Criteria
| ||||
77 | Gas Installation Works involved within this Lot may include (but not limited to the following): Domestic Gas Pipework Installations. Commercial Gas Pipework Installations. Gas Boiler Installations Central Heating Installations Bidders must provide evidence of Gas Safe Award Criteria
| ||||
78 | Building Management Systems (BMS) - Installation Only Works involved within this Lot may include (but not limited to the following): BMS (Building Management Services) - installation only. All other elements will be carried out by City Building's internal BMS team. Award Criteria
| ||||
79 | Electrical Charging Points Works involved within this Lot may include (but not limited to the following): Installation of Electrical vehicle charging points and associated works Maintenance of Electrical Vehicle charging points and associated works. Bidders must be approved NICEIC or SELECT Award Criteria
| ||||
80 | Drain Cleaning and Repairs/Chute Cleaning Works involved within this Lot may include (but not limited to the following): Minor drainage repairs including civil works. Drain cleaning. Chute cleaning to multi-storey properties Award Criteria
| ||||
81 | Swimming Pool Preventative Maintenance and Repairs Works involved within this Lot may include (but not limited to the following): Pool tiling where pool is full. Repair to pool plant. Maintenance to pool filters and associated works. Award Criteria
| ||||
82 | Steeplejack Services Works involved within this Lot may include (but not limited to the following): Rope and Harness work for building de-weeding. Rope and Harness work for repairs for stonework. Rope and harness repairs to traditional and non-traditional roofs. Award Criteria
| ||||
83 | Specialist Ironmongery Repairs and Locksmiths Works involved within this Lot may include (but not limited to the following): Repairs to traditional and non-traditional windows and doors including sourcing parts etc. Locksmiths services to include call-outs where required. Award Criteria
| ||||
84 | Emerging Renewable Technology Including Retro-Fit Works involved within this Lot may include (but not limited to the following): Internal insulation systems (Walls/ Floors/ Roofs etc) Passivhaus Informed Technologies including, but not limited to: Specialist Timber Construction Cross Laminated Timber Construction Triple Glazing Air Tightness methodologies Award Criteria
| ||||
85 | Domestic Ventilation Installation (PAS2035 STANDARD) Works involved within this Lot may include (but not limited to the following): Ventilation Assessments Purge ventilation Background ventilation Intermittent Extract Ventilation systems/ Extractor Fans Associated works (ie. door undercutting etc) Retrofit Designing Retrofit Assessments Retrofit Coordination Award Criteria
| ||||
86 | External Wall Insulation Works involved within this Lot may include (but not limited to the following): Insulating solid external walls Insulating cavity external walls Render/ Cladding/ Tiled/ Brick Slip finishes All associated finishings, membranes, sealants Design of new systems (and associated statutory consents/funding applications) Award Criteria
| ||||
87 | Internal Wall and Floor Insulation Works involved within this Lot may include (but not limited to the following): Insulating existing walls Insulating existing floors/ ceilings Erection of new partitions All associated works (removing all internal/ external fittings) Award Criteria
| ||||
88 | Battery Storage Works involved within this Lot may include (but not limited to the following): Solar Battery Storage Systems Battery Energy Storage Systems (BESS) – Solar/ Wind etc Compressed Air Energy Storage Mechanical Gravity Energy Storage Flow Batteries Award Criteria
| ||||
89 | Elevated Working Platforms Works involved within this Lot may include (but not limited to the following): Fixed elevated working platforms to facilitate investment works in multi-storey properties such as window renewal and cladding works. Temporary access cradles to facilitate short-term repair works on multi-storey properties. Award Criteria
|
CPV Codes
- 45000000 - Construction work
- 45262300 - Concrete work
- 45262330 - Concrete repair work
- 45262350 - Unreinforced-concrete work
- 45262310 - Reinforced-concrete work
- 45210000 - Building construction work
- 44230000 - Builders' carpentry
- 45420000 - Joinery and carpentry installation work
- 44112430 - Roof trusses
- 45262640 - Environmental improvement works
- 45262521 - Facing brickwork
- 45262522 - Masonry work
- 45262500 - Masonry and bricklaying work
- 45261420 - Waterproofing work
- 45260000 - Roof works and other special trade construction works
- 45261200 - Roof-covering and roof-painting work
- 45312310 - Lightning-protection works
- 45410000 - Plastering work
- 45442100 - Painting work
- 45442180 - Repainting work
- 45451000 - Decoration work
- 45421146 - Installation of suspended ceilings
- 45262650 - Cladding works
- 45431000 - Tiling work
- 44220000 - Builders' joinery
- 45421000 - Joinery work
- 45421140 - Installation of metal joinery except doors and windows
- 45421150 - Non-metal joinery installation work
- 39515100 - Curtains
- 39515400 - Blinds
- 45421145 - Installation work of roller blinds
- 45421143 - Installation work of blinds
- 42933100 - Sanitary vending machines
- 42968200 - Sanitary dispensing machines
- 44411000 - Sanitary ware
- 45111250 - Ground investigation work
- 71510000 - Site-investigation services
- 51700000 - Installation services of fire protection equipment
- 45330000 - Plumbing and sanitary works
- 45232141 - Heating works
- 45331210 - Ventilation installation work
- 45310000 - Electrical installation work
- 45311000 - Electrical wiring and fitting work
- 45311100 - Electrical wiring work
- 45331000 - Heating, ventilation and air-conditioning installation work
- 45331100 - Central-heating installation work
- 45332200 - Water plumbing work
- 09300000 - Electricity, heating, solar and nuclear energy
- 45262660 - Asbestos-removal work
- 42416100 - Lifts
- 45313100 - Lift installation work
- 45313000 - Lift and escalator installation work
- 42416400 - Escalators
- 45313200 - Escalator installation work
- 45350000 - Mechanical installations
- 45351000 - Mechanical engineering installation works
- 50721000 - Commissioning of heating installations
- 45111100 - Demolition work
- 48952000 - Public address systems
- 45441000 - Glazing work
- 45111230 - Ground-stabilisation work
- 45111240 - Ground-drainage work
- 45343230 - Sprinkler systems installation work
- 44115500 - Sprinkler systems
- 45262320 - Screed works
- 45262321 - Floor-screed works
- 39531400 - Carpeting
- 31625000 - Burglar and fire alarms
- 45223210 - Structural steelworks
- 44212310 - Scaffolding
- 44212317 - Scaffolding structures
- 45262100 - Scaffolding work
- 45262110 - Scaffolding dismantling work
- 45262120 - Scaffolding erection work
- 45262670 - Metalworking
- 39310000 - Catering equipment
- 50883000 - Repair and maintenance services of catering equipment
- 39370000 - Water installations
- 33141640 - Drain
- 43324100 - Equipment for swimming pools
- 45421160 - Ironmongery work
- 45320000 - Insulation work
Indicators
- This is a recurring contract.
- Renewals are available.
- Financial restrictions apply.
- Technical restrictions apply.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** Health and Safety will be assessed on a PASS/FAIL basis - Bidders must hold ISO18001/ISO450001, or lot specific SSIP or comply with all questions in the Health and Safety Questionnaire. Environmental will be assessed on a PASS/FAIL basis - Bidders must hold ISO14001 or comply with all questions in the Environmental Questionnaire. Quality will be assessed on a PASS/FAIL basis - Bidders must hold ISO 9001 or comply with all questions in the Quality Questionnaire. Freedom of Information Act - Information on the FOI act is contained in the tender documents Insurance Mandate - Bidders will be asked to sign and return an Insurance Mandate that authorises CBG to request copies of insurance documents from the bidders insurance provider, should the bidder be successful Non Collusion - Bidders will be required to complete the Non Collusion Certificate contained within the tender documents. Additional information relevant to this Framework opportunity can be found in the tender documents and SPD guidance documents The buyer is using PCS-Tender to conduct this PQQ exercise. The Project code is 19186. For more information see: http://www.publiccontractsscotland.gov.uk/info/InfoCentre.aspx?ID=2343 A sub-contract clause has been included in this contract. For more information see: http://www.publiccontractsscotland.gov.uk/info/InfoCentre.aspx?ID=2363 Community benefits are included in this requirement. For more information see: https://www.gov.scot/policies/public-sector-procurement/community-benefits-in-pr... A summary of the expected community benefits has been provided as follows: Community Benefits will be detailed and evaluated at ITT Stage. City Building(Glasgow) LLP reserves the right to further request Community Benefits at mini competition stage on a proportionate and reasonable basis. The criteria will be based on a project by project basis and may be requested during the life of the framework agreement. (SC Ref:659301)
Reference
- ocds-h6vhtk-02e2ac
- FTS 022945-2022