North Campus - Industry Hub

A Tender Notice
by BURNLEY COLLEGE

Source
Find a Tender
Type
Contract (Works)
Duration
23.5 month
Value
£10M
Sector
CONSTRUCTION
Published
18 Jan 2023
Delivery
To 18 Feb 2025 (est.)
Deadline
01 Mar 2023 12:00

Concepts

Location

North Campus of Burnley College, Princess Way, Burnley, BB12 0AN

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

This project comprises the development of the newly acquired North campus be developed to include: the construction of the new Industry Hub building; as well the construction of new infrastructure and landscaping elements. The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 4 Design information. Tenderers are to submit a bid against two options: • Option 1 being the delivery of the infrastructure and landscaping package only; and • Option 2 being the delivery of the infrastructure and landscaping package, as well as the a new Industry Hub building. The proposed works noted under Option 2, notably the construction of the new Industry Hub building will be dependent upon a successful outcome of the DfE funding bid, which is expected in Spring 2023. The net construction cost is approximately £10 million. Please note that achievement of a July 2024 completion date is a key requirement for the College to facilitate an opening in September 2024. However any improvement and programme benefit on this completion date will be sought.

Total Quantity or Scope

In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension. The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known. Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings. Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College. At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct. The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus. There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature. Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond. The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023. The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT. The College has procured Project Team and Design Services to complete up to RIBA Stage 4. The following Design Disciplines are proposed to be novated to the Principal Contractor. • Architect (lead Designer) - ABW Architects • Landscape Designer - Milieu Landscape Design • Civil & Structural Engineering Consultants - Waterman Group.

CPV Codes

  • 45000000 - Construction work
  • 45100000 - Site preparation work
  • 45200000 - Works for complete or part construction and civil engineering work
  • 45300000 - Building installation work
  • 45400000 - Building completion work
  • 45500000 - Hire of construction and civil engineering machinery and equipment with operator
  • 71200000 - Architectural and related services
  • 71300000 - Engineering services
  • 71400000 - Urban planning and landscape architectural services
  • 71500000 - Construction-related services
  • 71600000 - Technical testing, analysis and consultancy services
  • 71700000 - Monitoring and control services

Indicators

  • This is a one-off contract (no recurrence)
  • Renewals are not available.
  • Professional qualifications are sought.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains