Port of Dover Maintenance Dredging 2023

A Tender Notice
by DOVER HARBOUR BOARD

Source
Find a Tender
Type
Contract (Services)
Duration
7 month
Value
___
Sector
ENVIRONMENT
Published
27 Mar 2023
Delivery
01 Jun 2023 to 31 Dec 2023
Deadline
27 Apr 2023 00:00

Concepts

Location

The Port of Dover

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt. With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010. Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor. Pre and post dredge formal contract surveys using a multi-beam echo sounder, resulting in near total seabed coverage, shall be commissioned by the Employer from an independent survey Contractor.

CPV Codes

  • 98360000 - Marine services

Indicators

  • This is a one-off contract (no recurrence)
  • Renewals are not available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** Tender documents are anticipated to be issued on 28th April 2023.

Reference

Domains