HHP Investment Works Framework 2023 - 2029
A Contract Award Notice
by HEBRIDEAN HOUSING PARTNERSHIP LTD
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- not specified
- Value
- £20M-£26M
- Sector
- CONSTRUCTION
- Published
- 04 Apr 2023
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Scotland: Lewis, Harris, Uists and Barra
1 buyer
- Hebridean Housing Partnership Stornoway
5 suppliers
- Fes FM Stornoway
- Alex Murray Construction Stornoway
- Neil Mackay Western Isles
- Omac Construction Stornoway
- A Campbell Electrical Services Stornoway
Description
Hebridean Housing Partnership (HHP) is seeking to establish a multi lot, multi supplier framework to deliver its Investment Works programme for 2023 – 2027. HHP intend to appoint up to a maximum five contractors per Lot of the framework. The framework geographical delivery locations are: Lewis, Harris, Uists and Barra. The framework covers the following types of work across 18 lots: - Windows & Doors - Heating - Bathrooms - Kitchens - Roofing & Roughcast - Electrical - Environmental - Occupational Therapy - Energy Efficiency
Lot Division
1 | Windows & Door Replacement - Lewis & Harris
Covers the replacement of window, doors, roof windows and store doors etc. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. |
2 | Heating Replacement Works - Lewis & Harris
Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
3 | Bathroom Replacement Works - Lewis & Harris
Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. |
4 | Kitchen Replacement - Lewis & Harris
Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. |
5 | Roofing & Roughcast Works - Lewis & Harris
Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
6 | Electrical Works - Lewis & Harris
Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
7 | Environmental Works - Lewis & Harris
Covers the installation of fencing, footpaths and drainage works to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
8 | Occupational Therapy Works - Lewis & Harris
Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
9 | Window & Door Replacement - Uists & Barra
Covers the replacement of window, doors, roof windows and store doors etc. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
10 | Heating Replacement - Uists & Barra
Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system. Scope includes: -Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
11 | Bathroom Replacement - Uists & Barra
Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
12 | Kitchen Replacement - Uists & Barra
Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period. |
13 | Roofing & Roughcast Works - Uists & Barra Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt). Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced. Fencing covers for new low level timber palisade fencing. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install- Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
14 | Electrical Works - Uists & Barra
Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
15 | Environmental Works - Uists and Barra
Covers the installation of fencing, footpaths and drainage works to properties Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
16 | Occupational Therapy Works - Uists & Barra
Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
17 | Energy Efficiency Works - All Areas Covers the upgrading of insulation to walls and roofs and all associated work to properties. Scope includes: - Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants - Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents - Install - Install and make good as appropriate - Commissioning - Commission any new equipment - Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period |
18 | Bathroom, Kitchen & Heating Installation Works - All Areas
Covers larger programmes of work in relation to installation of bathrooms, kitchens and heating replacements. Programmes will not necessarily cover all three elements and may be restricted to a single element as applicable. |
Award Detail
1 | Fes FM (Stornoway)
|
2 | Alex Murray Construction (Stornoway)
|
3 | Neil Mackay (Western Isles)
|
4 | Alex Murray Construction (Stornoway)
|
5 | Fes FM (Stornoway)
|
6 | Alex Murray Construction (Stornoway)
|
7 | Fes FM (Stornoway)
|
8 | Alex Murray Construction (Stornoway)
|
9 | Fes FM (Stornoway)
|
10 | Alex Murray Construction (Stornoway)
|
11 | Fes FM (Stornoway)
|
12 | Alex Murray Construction (Stornoway)
|
13 | Fes FM (Stornoway)
|
14 | Alex Murray Construction (Stornoway)
|
15 | Fes FM (Stornoway)
|
16 | Alex Murray Construction (Stornoway)
|
17 | Alex Murray Construction (Stornoway)
|
18 | Fes FM (Stornoway)
|
19 | Alex Murray Construction (Stornoway)
|
20 | Fes FM (Stornoway)
|
21 | Alex Murray Construction (Stornoway)
|
22 | Fes FM (Stornoway)
|
23 | Alex Murray Construction (Stornoway)
|
24 | Omac Construction (Stornoway)
|
25 | Fes FM (Stornoway)
|
26 | Neil Mackay (Western Isles)
|
27 | Fes FM (Stornoway)
|
28 | Alex Murray Construction (Stornoway)
|
29 | Omac Construction (Stornoway)
|
30 | A Campbell Electrical Services (Stornoway)
|
31 | Fes FM (Stornoway)
|
32 | Alex Murray Construction (Stornoway)
|
33 | Fes FM (Stornoway)
|
34 | Alex Murray Construction (Stornoway)
|
35 | Alex Murray Construction (Stornoway)
|
36 | Fes FM (Stornoway)
|
37 | Alex Murray Construction (Stornoway)
|
38 | Fes FM (Stornoway)
|
Award Criteria
Quality | 60 |
price | 40 |
CPV Codes
- 45211300 - Houses construction work
- 44221000 - Windows, doors and related items
- 44221100 - Windows
- 44221110 - Window frames
- 45421100 - Installation of doors and windows and related components
- 45421110 - Installation of door and window frames
- 45421112 - Installation of window frames
- 45421130 - Installation of doors and windows
- 45421132 - Installation of windows
- 44221200 - Doors
- 44221211 - Door frames
- 44221213 - Door thresholds
- 44221220 - Fire doors
- 45421111 - Installation of door frames
- 39715200 - Heating equipment
- 39715210 - Central-heating equipment
- 42131110 - Central-heating radiator valves
- 44115200 - Plumbing and heating materials
- 44115220 - Heating materials
- 44620000 - Central-heating radiators and boilers and parts
- 44621110 - Central-heating radiators
- 44621220 - Central-heating boilers
- 45232141 - Heating works
- 45315000 - Electrical installation work of heating and other electrical building-equipment
- 45331100 - Central-heating installation work
- 44115210 - Plumbing materials
- 45330000 - Plumbing and sanitary works
- 45332200 - Water plumbing work
- 44411200 - Baths
- 45211310 - Bathrooms construction work
- 39141000 - Kitchen furniture and equipment
- 39141400 - Fitted kitchens
- 45421151 - Installation of fitted kitchens
- 44112400 - Roof
- 44112410 - Roof frames
- 44112420 - Roof supports
- 44112500 - Roofing materials
- 45260000 - Roof works and other special trade construction works
- 45261200 - Roof-covering and roof-painting work
- 45261210 - Roof-covering work
- 45261211 - Roof-tiling work
- 45261212 - Roof-slating work
- 45262522 - Masonry work
- 31681410 - Electrical materials
- 31681000 - Electrical accessories
- 45310000 - Electrical installation work
- 45311000 - Electrical wiring and fitting work
- 45311100 - Electrical wiring work
- 45311200 - Electrical fitting work
- 45317000 - Other electrical installation work
- 34928200 - Fences
- 34928220 - Fencing components
- 45342000 - Erection of fencing
- 45233161 - Footpath construction work
- 45233253 - Surface work for footpaths
- 45111240 - Ground-drainage work
- 45210000 - Building construction work
- 44411400 - Shower basins
- 44115600 - Stairlifts
- 34953000 - Access ramps
- 45421131 - Installation of doors
- 45331000 - Heating, ventilation and air-conditioning installation work
- 45261420 - Waterproofing work
- 31680000 - Electrical supplies and accessories
- 31681400 - Electrical components
- 45233340 - Foundation work for footpaths
- 45321000 - Thermal insulation work
- 45261410 - Roof insulation work
- 45320000 - Insulation work
Indicators
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** (SC Ref:720340)
Reference
- ocds-h6vhtk-03623b
- FTS 009766-2023