National Contractor Framework

A Tender Notice
by ALDER HEY CHILDREN'S NHS FOUNDATION TRUST

Source
Find a Tender
Type
Framework (Works)
Duration
4 year
Value
£-£8B
Sector
CONSTRUCTION
Published
17 Apr 2023
Delivery
To 16 May 2027 (est.)
Deadline
06 Jun 2023 11:00

Concepts

Location

North East England:

Geochart for 1 buyers and 0 suppliers

Description

Alder Hey Children's NHS Foundation Trust as the Contracting Authority intends to let a National Contractor Framework with a maximum duration of four years, which may be used by public sector bodies / 'Contracting Authorities' as defined by the Public Contracts Regulations 2015. The Framework is designed to align with the ambitions of the Construction Playbook, and to help the public sector deliver on the Government's ambition to 'build back better' bringing together commercial best practice and reform to drive better, faster, greener delivery. A Framework go-live date of 1st November 2023 is planned. Please refer to the procurement documents for a breakdown of the procurement timetable. The Framework is therefore anticipated to expire in October 2027 but in line with the Public Contracts Regulations 2015 Framework users may award contracts under the Framework which may exceed the length of the Framework itself. Potential Framework users may include: Schools, Academies, Colleges, Universities, Blue Light/Emergency Services, NHS Bodies, Local Authorities, Health and Social Care Bodies, Housing Associations, Libraries and Museums, Registered Charities,Government Departments, Leisure Providers, Clinical Commissioning Groups; as more particularly set out in Additional Information (Section 5) below. Users of the Framework will be able to procure works with associated services (e.g., new build, refurbishment, fit out, infrastructure, single site/project works or multi site projects/ programmes of works). Projects may be of Design and Build or Build Only in nature, under a Two Stage or Single Stage procurement route, embracing both NEC and JCT forms of contract, in compliance with the restrictions on and full freedoms for the range of works and building types provided by the CPV codes referenced.

Lot Division

1 1. Construction - North East - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

2 2. Construction - North East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

3 3. Construction - North East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

4 4. Construction - North East - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

5 5. Construction - North East - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

6 6. Construction - Yorkshire - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

7 7. Construction - Yorkshire - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

8 8. Construction - Yorkshire - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

9 9. Construction - Yorkshire - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

10 10. Construction - Yorkshire - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

11 11. Construction - West Midlands - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

12 12. Construction - West Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

13 13. Construction - West Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot. Additional information: Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

14 14. Construction - West Midlands - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

15 15. Construction - West Midlands - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

16 16. Construction - East Midlands - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

17 17. Construction - East Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

18 18. Construction - East Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

19 19. Construction - East Midlands - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

20 20. Construction - East Midlands - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

21 21. Construction - East of England - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

22 22. Construction - East of England - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

23 23. Construction - East of England - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

24 24. Construction - East of England - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

25 25. Construction - East of England - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

26 26. Construction - South East - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

27 27. Construction - South East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

28 28. Construction - South East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

29 29. Construction - South East - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

30 30. Construction - South East - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

31 31. Construction - London - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

32 32. Construction - London - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

33 33. Construction - London - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

34 34. Construction - London - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

35 35. Construction - London - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

36 36. Construction - South West - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

37 37. Construction - South West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

38 38. Construction - South West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

39 39. Construction - South West - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

40 40. Construction - South West - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

41 41. Decarbonisation and Retrofit - North East - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

42 42. Decarbonisation and Retrofit - North East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

43 43. Decarbonisation and Retrofit - North East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

44 44. Decarbonisation and Retrofit - North East - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

45 45. Decarbonisation and Retrofit - Yorkshire - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

46 46. Decarbonisation and Retrofit - Yorkshire - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

47 47. Decarbonisation and Retrofit - Yorkshire - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

48 48. Decarbonisation and Retrofit - Yorkshire - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

49 49. Decarbonisation and Retrofit - North West - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

50 50. Decarbonisation and Retrofit - North West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

51 51. Decarbonisation and Retrofit - North West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

52 52. Decarbonisation and Retrofit - North West - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

53 53. Decarbonisation and Retrofit - West Midlands - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

54 54. Decarbonisation and Retrofit - West Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

55 55. Decarbonisation and Retrofit - West Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

56 56. Decarbonisation and Retrofit - West Midlands - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

57 57. Decarbonisation and Retrofit - East Midlands - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

58 58. Decarbonisation and Retrofit - East Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

59 59. Decarbonisation and Retrofit - East Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

60 60. Decarbonisation and Retrofit - East Midlands - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

61 61. Decarbonisation and Retrofit - East of England - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

62 62. Decarbonisation and Retrofit - East of England - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

63 63. Decarbonisation and Retrofit - East of England - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

64 64. Decarbonisation and Retrofit - East of England - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

65 65. Decarbonisation and Retrofit - South East - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

66 66. Decarbonisation and Retrofit - South East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

67 67. Decarbonisation and Retrofit - South East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

68 68. Decarbonisation and Retrofit - South East - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

69 69. Decarbonisation and Retrofit - London - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

70 70. Decarbonisation and Retrofit - London - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

71 71. Decarbonisation and Retrofit - London - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

72 72. Decarbonisation and Retrofit - London - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

73 73. Decarbonisation and Retrofit - South West - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

74 74. Decarbonisation and Retrofit - South West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

75 75. Decarbonisation and Retrofit - South West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

76 76. Decarbonisation and Retrofit - South West - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

77 77. Demolition and Site Preparation - North East - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

78 78. Demolition and Site Preparation - North East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

79 79. Demolition and Site Preparation - North East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

80 80. Demolition and Site Preparation - North East - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

81 81. Demolition and Site Preparation - Yorkshire - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

82 82. Demolition and Site Preparation - Yorkshire - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

83 83. Demolition and Site Preparation - Yorkshire - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

84 84. Demolition and Site Preparation - Yorkshire - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

85 85. Demolition and Site Preparation - North West - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

86 86. Demolition and Site Preparation - North West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

87 87. Demolition and Site Preparation - North West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

88 88. Demolition and Site Preparation - North West - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

89 89. Demolition and Site Preparation - West Midlands - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

90 90. Demolition and Site Preparation - West Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

91 91. Demolition and Site Preparation - West Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

92 92. Demolition and Site Preparation - West Midlands - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

93 93. Demolition and Site Preparation - East Midlands - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

94 94. Demolition and Site Preparation - East Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

95 95. Demolition and Site Preparation - East Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

96 96. Demolition and Site Preparation - East Midlands - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

97 97. Demolition and Site Preparation - East of England - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

98 98. Demolition and Site Preparation - East of England - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

99 99. Demolition and Site Preparation - East of England - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

100 100. Demolition and Site Preparation - East of England - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

101 101. Demolition and Site Preparation - South East - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

102 102. Demolition and Site Preparation - South East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

103 103. Demolition and Site Preparation - South East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

104 104. Demolition and Site Preparation - South East - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

105 105. Demolition and Site Preparation - London - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

106 106. Demolition and Site Preparation - London - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

107 107. Demolition and Site Preparation - London - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

108 108. Demolition and Site Preparation - London - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

109 109. Demolition and Site Preparation - South West - £50k to £1m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

110 110. Demolition and Site Preparation - South West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

111 111. Demolition and Site Preparation - South West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

112 112. Demolition and Site Preparation - South West - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

113 113. Housing - North East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

114 114. Housing - North East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

115 115. Housing - North East - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

116 116. Housing - Yorkshire - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

117 117. Housing - Yorkshire - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

118 118. Housing - Yorkshire - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

119 119. Housing - North West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

120 120. Housing - North West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

121 121. Housing - North West - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

122 122. Housing - West Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

123 123. Housing - West Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

124 124. Housing - West Midlands - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

125 125. Housing - East Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

126 126. Housing - East Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

127 127. Housing - East Midlands - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

128 128. Housing - East of England - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

129 129. Housing - East of England - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

130 130. Housing - East of England - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

131 131. Housing - South East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

132 132. Housing - South East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

133 133. Housing - South East - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

134 134. Housing - London - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

135 135. Housing - London - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

136 136. Housing - London - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

137 137. Housing - South West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

138 138. Housing - South West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

139 139. Housing - South West - £15m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

140 140. Infrastructure - North East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

141 141. Infrastructure - North East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

142 142. Infrastructure - North East - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

143 143. Infrastructure - North East - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

144 144. Infrastructure - Yorkshire - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

145 145. Infrastructure - Yorkshire - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

146 146. Infrastructure - Yorkshire - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

147 147. Infrastructure - Yorkshire - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

148 148. Infrastructure - West Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

149 149. Infrastructure - West Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

150 150. Infrastructure - West Midlands - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

151 151. Infrastructure - West Midlands - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

152 152. Infrastructure - East Midlands - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

153 153. Infrastructure - East Midlands - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

154 154. Infrastructure - East Midlands - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

155 155. Infrastructure - East Midlands - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

156 156. Infrastructure - East of England - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

157 157. Infrastructure - East of England - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

158 158. Infrastructure - East of England - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

159 159. Infrastructure - East of England - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

160 160. Infrastructure - South East - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

161 161. Infrastructure - South East - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

162 162. Infrastructure - South East- £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

163 163. Infrastructure - South East- £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

164 164. Infrastructure - London - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

165 165. Infrastructure - London - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

166 166. Infrastructure - London - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

167 167. Infrastructure - London - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

168 168. Infrastructure - South West - £1m to £5m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

169 169. Infrastructure - South West - £5m to £15m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

170 170. Infrastructure - South West - £15m to £30m

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

171 171. Infrastructure - South West - £30m+

Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.

CPV Codes

  • 45000000 - Construction work
  • 44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
  • 45100000 - Site preparation work
  • 45210000 - Building construction work
  • 45220000 - Engineering works and construction works
  • 45260000 - Roof works and other special trade construction works
  • 45300000 - Building installation work
  • 45400000 - Building completion work
  • 45500000 - Hire of construction and civil engineering machinery and equipment with operator
  • 71000000 - Architectural, construction, engineering and inspection services
  • 70112000 - Development of non-residential real estate
  • 70120000 - Buying and selling of real estate
  • 70322000 - Vacant-land rental or sale services
  • 45112730 - Landscaping work for roads and motorways
  • 45213312 - Car park building construction work
  • 45221000 - Construction work for bridges and tunnels, shafts and subways
  • 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • 45243000 - Coastal-defence works
  • 45246000 - River regulation and flood control works
  • 45316000 - Installation work of illumination and signalling systems
  • 45223000 - Structures construction work

Indicators

  • Variant bids may be considered.
  • This is a recurring contract.
  • Renewals are not available.
  • Professional qualifications are sought.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** The framework agreement will be established for 4 years. Contracting Authorities who can access this agreement can be found here - https://www.procurepartnerships.co.uk/eligibleusers

Reference

Domains