Fit Out - Lift Steelwork & Glazing -WP12.2.1 - Old Oak Common (S4) Station Re-open
A Tender Notice
by BALFOUR BEATTY VINCI SYSTRA JV
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 3 year
- Value
- £10M-£20M
- Sector
- CONSTRUCTION
- Published
- 04 May 2023
- Delivery
- 01 Jan 2025 to 31 Mar 2028
- Deadline
- 18 May 2023 07:00
Concepts
Location
1 buyer
- Balfour Beatty VINCI Systra Watford
Description
NOTE: THIS IS A RE-OPENED OPPORTUNITY IF YOU RESPONSED TO THE ORIGINAL ADVERT YOU DO NOT NEED TO RESPOND TO THIS ADVERT. WP12.2.1 - HS2 Lift Steelwork & Glazing Scope of Work: The OOC Station HS2 Scenic Lifts Fit Out package consists of the primary steelwork and cladding to the OOC HS2 station scenic lifts and comprises of the following scope: • Detailed design, supply and installation of primary steelwork and glazed cladding to 12 scenic + 3 interchange lifts in the HS2 station platforms and concourse area, including provision of brackets, supports and required service holes to interfacing contractors. • Fully coordinated design with MEPH services, advertising, signage, station common components and lifts contractor, including design of brackets, supports and allowance for service holes. • Provide RIBA 5 design and construction drawings including connection details, fabrication drawings, general arrangements, and elevation drawings for construction.
CPV Codes
- 42416100 - Lifts
- 45262670 - Metalworking
- 45441000 - Glazing work
- 45210000 - Building construction work
- 45223100 - Assembly of metal structures
- 39299200 - Safety glass
- 45223110 - Installation of metal structures
Indicators
- Contract is suitable for SMEs.
Other Information
No Documentation is included at this point. Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=70652...
Reference
- C4N70652408
- CF 3d7fe79a-8771-4d40-910e-197ceb12543a