Rockfall Protection System Installation
A Tender Notice
by DOVER HARBOUR BOARD
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 3.5 year
- Value
- £5M
- Sector
- CONSTRUCTION
- Published
- 05 Jun 2023
- Delivery
- 13 Nov 2023 to 01 Jul 2027
- Deadline
- 21 Jul 2023 11:00
Concepts
Location
1 buyer
- Dover Harbour Board Dover
Description
The Contractor provides the management and implementation of the Rockfall Protection Systems 'Phase II - Phase V', summarised below: • Phase II (Envisaged Commencement within 2023) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase III Envisaged Commencement within 2024) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase IV Envisaged Commencement within 2025) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase V Envisaged Commencement within 2026) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
CPV Codes
- 45243100 - Cliff-protection works
- 45243110 - Cliff-stabilisation works
Indicators
- Contract is suitable for SMEs.
Reference
- Port of Dover
- CF 775bdf8d-86b1-449e-8015-ac3c82677ec8