Instrumentation and Monitoring (I&M)

A Tender Notice
by SKANSKA CONSTRUCTION UK LIMITED

Source
Contracts Finder
Type
Contract (Works)
Duration
1 year
Value
£20K-£30K
Sector
TECHNOLOGY
Published
11 Jul 2023
Delivery
08 Nov 2023 to 08 Nov 2024
Deadline
11 Aug 2023 16:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Skanska is preparing to deliver the A428 Black Cat to Caxton Gibbet Improvement Scheme on behalf of National Highways. This package is for supplying instrumentation and monitoring solutions as follows; Measurement of settlement is required at selected earthwork locations as outlined in the Series 600 Numbered Appendices for Earthworks document and scheme specific drawings. Within the series 600 numbered appendices the locations of the instrumentation are shown in Table 6/12.1 and Drawings in Table 6/3-1. The instrumentation shall comprise magnet extensometers and surface settlement monitoring points. The Contractor shall provide, install, protect and maintain for the duration of the contract the instrumentation indicated in Table 6/12-1 and described in Appendix 6/12. The Contractor shall provide the equipment necessary to monitor the instrumentation. Termination of earthworks monitoring before the end of the contract is only acceptable with the agreement of the Design Organisation. The instrumentation shall be installed under the supervision of the Design Organisation, by the appointed Instrumentation Contractor. At least two weeks prior to the installation the Contractor shall provide a method statement giving details of the proposed instrumentation and its installation to the Design Organisation. Standard Details of the monitoring points can be found on drawing HE551495-MOTG-HGT-CONWI_CONW-DE-CE-06506. Instrumentation shall be installed as soon as practical after the earthworks are constructed to full height. The extensometers will be constructed within a borehole, formed from the finished surface level of the earthwork. Settlement monitoring points shall be constructed at the surface of the finished earthwork. l instrumentation shall have its head level and position monitored to allow potential adjustments, to be agreed with the Design Organisation. Each instrument shall be adequately marked with its reference number.

CPV Codes

  • 31682210 - Instrumentation and control equipment

Indicators

  • Contract is suitable for SMEs.

Other Information

You will be invited to complete our Request for Information (RFI), conducted on our Oracle Cloud platform. The RFI will only take between 10 & 15 minutes to complete, at the end of the process you will be told if you have been shortlisted. If you have you will be invited to respond to the full Request for Quotation (RFQ), which will be issued shortly after the RFI closes. Please see attached the link with a project overview - https://nationalhighways.co.uk/our-roads/a428-black-cat-to-caxton-gibbet/ To respond to our expression of interest request, please see this link which will take you to a Microsoft form - https://forms.office.com/r/nTQdtVFTiH To respond to our expression of interest request, please see the link above which will take you to a Microsoft form https://forms.office.com/r/nTQdtVFTiH

Reference

Domains