UKRI-2960 Building R69 Design and Build

A Tender Notice
by UK RESEARCH AND INNOVATION

Source
Find a Tender
Type
Contract (Works)
Duration
28 month
Value
£0-£4M
Sector
CONSTRUCTION
Published
04 Aug 2023
Delivery
27 Oct 2023 to 20 Feb 2026
Deadline
25 Sep 2023 13:00

Concepts

Location

Oxfordshire

Geochart for 1 buyers and 0 suppliers

Description

This document sets out the Client (UKRI) Brief for the Building to replace HRPD Building R69 for ISIS Neutron and Muon Source based at Rutherford Appleton Laboratory at Didcot, Oxfordshire. The new building will aim to provide ample space for the new instruments, better staff facilities and allow for future adaptability should new instruments or experiments need to be accommodated. The new building is proposed to be a 2-storey building built on the existing footprint. The proposed building contains a main Instrument Hall and supporting facilities such as Control Room, Meeting Room and Laboratory. The project is currently at RIBA Stage 3.

Total Quantity or Scope

This requirement document sets out the Client Brief for the Building to replace HRPD Building R69 for ISIS Neutron and Muon Source based at Rutherford Appleton Laboratory at Didcot, Oxfordshire. Estimated construction value £3,888,200 +VAT. This is to be read in conjunction with the requirements detailed in Appendices in the eSourcing Portal. The High Resolution Powder Diffractometer (HRPD) is a world leading neutron instrument, built in the 1980’s. It will be upgraded to become HRPD-x with increased capacity and capabilities utilising state of the art technology. The existing R69 HRPD Building is brick building at the end of a 90m guide tunnel. The guide tunnel consists of a portal frame, slab and concrete ‘F’ Section. A modular extension was added in 2019. Inadequate radiation shielding and lack of internal space available means the original building is no longer fit for purpose. … The new HRPD-x Building is proposed to be a 2-storey building built on the existing footprint. … The Instrument Hall brief includes a fully removable interlocking concrete mezzanine floor over the instrument. A 6.3T crane is to be installed to allow for the lift out of the mezzanine floor panels and maintenance / replacement of elements of the Instrument. The Guide Tunnel is largely due to remain, with certain elements being removed and re-built including a portion the ‘F’ Section and with the entirety of the Guide Tunnel being re-clad. … Appendix 3. Stage 3 Documents contains the Stage 3 Architectural, Structural and MEP design reports for the proposed building. The RIBA Stage 3 Report is to be validated and enhanced by the new design team under PCSA, as part of a two-stage design and build process by the successful contractor. 1. Increase in building size and footprint. 2. No impact on existing vehicular access. 3. Radiation shielding incorporated into design of the building (designs for shielding elements will be provided and validated by STFC). 4. Access into the instrument hall via a large roller shutter to remove equipment or instrument via over-head crane system. Large roller shutter door split and ground floor to become large openable doors. 5. Provide internal vertical circulation from main entrance lobby. 6. Internal Pedestrian lift required. 7. External equipment lift with capacity of 1000kg. 8. First floor instrumentation hall floor panels to be removable. 9. Laboratory space at first floor. 10. Crane to allow removal of floor and instrument components – specification provided by client. 11. Staff welfare facilities. 12. Meeting room. 13. Instrument control room. 14. Re-clad/upgrade of guide tunnel. 15. Replacement of a portion of the concrete ‘F’ Section Further details are contained in the tender documentation which should be read and understood fully. Additional information: To respond to this opportunity please click here: https://ukri.delta-esourcing.com/respond/24UAG6G5S4

Renewal Options

The contract is for 2 stages, PCSA for the design and then, subject to UKRI instruction, the Build. The contract may end after the design PCSA stage.

CPV Codes

  • 45210000 - Building construction work

Indicators

  • This is a one-off contract (no recurrence)
  • Options are available.
  • Renewals are not available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement. For more information about this opportunity, please visit the Delta eSourcing portal at: <a href="https://ukri.delta-esourcing.com/tenders/UK-UK-Swindon:-Building-construction-work./24UAG6G5S4" target="_blank">https://ukri.delta-esourcing.com/tenders/UK-UK-Swindon:-Building-construction-work./24UAG6G5S4 To respond to this opportunity, please click here: <a href="https://ukri.delta-esourcing.com/respond/24UAG6G5S4" target="_blank">https://ukri.delta-esourcing.com/respond/24UAG6G5S4 GO Reference: GO-202384-PRO-23575386

Reference

Domains