Barmouth North Prom

A Prior Information Notice
by YMGYNGHORIAETH GWYNEDD CONSULTANCY

Source
Find a Tender
Type
Future Contract (Works)
Duration
not specified
Value
24M
Sector
CONSTRUCTION
Published
28 Sep 2023
Delivery
not specified
Deadline
n/a

Concepts

Location

Barmouth

Geochart for 1 buyers and 0 suppliers

Description

Gwynedd Council seek to appoint a supplier for the Design and Build of the Barmouth North Promenade FAS. The chosen supplier shall further develop the preferred option approved in the outline business case (OBC), into detailed design, consenting, full business case and construction. Subject to Welsh Government and Gwynedd Council approvals. The detailed design phase shall include: Project Planning and management Site Investigations and Surveys Stakeholder Engagement Detailed Design and modelling Environmental assessment Consenting – to include Planning, marine licencing and EIA. Construction Specification, pricing and risk register Full Business Case preparation Subject to the approval of the business case the construction phase will then be awarded (there will be appropriate breaks in the contract to allow for this).

Total Quantity or Scope

Open Tender with Qualification, Technical and Commercial assessments.

CPV Codes

  • 45220000 - Engineering works and construction works

Indicators

Other Information

Grid Ref: SH60283 17218 East: 260283 North: 31727 Background Barmouth is a town on the west coast of Snowdonia in Gwynedd. The North Promenade is the northern section of the Barmouth beach frontage, extending from the residential housing estate at Heol y Llan to the northern extent of the promenade wall. This section of the frontage supports the amenity value of the full promenade, whilst providing coastal protection to the adjacent land, properties and infrastructure. The 1.2km study area comprises a mix of hard coastal defences (sheet piled wall, concrete revetment and wave recurve wall, with masonry setback walls). Barmouth, and in particular, its north promenade is at risk of coastal flooding and erosion. It is commonplace to see overtopping at the north-most end of the promenade. Some 757 properties have greater than a 1 in 100 chance of coastal and/or surface water flooding in any year. The Barmouth North Prom Flood Alleviation Scheme (FAS) was included as part of Welsh Government’s Coastal Risk Management Programme and now forms part of Welsh Government’s Capital Programme. The outline business case (OBC) was approved by Welsh Government in 2021 – with a preferred option identified. Funding was granted for the detailed design stage (Full Business Case) in June 2023. The funding for Construction work will be subject to FBC approval through Welsh Government and Gwynedd Council. Preferred Option The preferred option involves work to address defects, extend the service and improve the existing defences, including; - Extend the life of the existing sheet piles with refurbishment works. - Raise the primary defences and add protection to the structure toe by a rock-toe or shingle beach profile (where material stability allows). - Strengthen and raise the set-back flood wall. - Improve demountable barriers and drainage. - Public-realm improvements including provision of dwell areas, beach access and connectivity to the wider community. NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=135148. (WA Ref:135148)

Reference

Domains