T1 Cranes Optimisation

A Utilities Contract Notice
by THE MERSEY DOCKS AND HARBOUR COMPANY LIMITED

Source
Find a Tender
Type
Framework (Supply)
Duration
4 year
Value
66M
Sector
INDUSTRIAL
Published
09 Oct 2023
Delivery
To 01 Dec 2027 (est.)
Deadline
01 Dec 2023 10:30

Concepts

Location

Port of Liverpool

Geochart for 2 buyers and 0 suppliers

2 buyers

Description

Royal Seaforth Container Terminal (RSCT) is a brownfield terminal located in Liverpool. It is an import-export terminal with a low transhipment percentage. There are additional empty depot / domestic flows at the landside, as well as interterminal traffic to and from Liverpool Terminal 2. Currently, RSCT is operating with straddle carriers, empty handlers and reach stackers, with manual Tug and Trailers used as horizontal transport towards inspection and Liverpool2. In addition, an on-dock rail facility is present for rail container handling serving the hinterland. The future rail volume is expected to increase and the rail terminal will be expanded. RSCT is reaching its capacity from a yard point of view and in order to address this Peel Ports intends to densify the yard to allow for further growth while simultaneously freeing up space for other activities. To achieve this aim, Peel Ports intends to procure twelve Automated Rail Mounted Gantry cranes (ARMGs).

Total Quantity or Scope

The Goods and Services will generally comprise of, but not limited too:- Design, manufacture, supply, delivery, off-loading, erection, installation on existing rails, testing, setting to work, successful completion of post commissioning performance test, endurance test and making good defects during the warranty period, the complete Automated ARMG System. Twelve aRMG cranes shall be delivered to the RSCT Quayside fully assembled. Design and installation, including all testing and commissioning, of the defined ARMG Automation system. Safe access provision for maintenance and operational work areas and aRMG transfer between blocks. Supply and commission a process simulator (Test Rig). Supply of remote operator station consoles. Training of the designated Customers Trainers, operational and engineering. Optional On-site Engineering support for the whole system for a period of 6 months. 3 Years Warranty on all Mechanical, Electrical, Drives, Control Systems, and Automation, including all Parts and Labour. 15 Years Warranty on Steelwork Corrosion Protection System, including all Materials and Labour. 15 Years Warranty on Structural Steelwork, including all Parts and Labour.

Renewal Options

The agreement shall also allow for the procurement of further aRMG cranes at a later date should further expansion be required.

CPV Codes

  • 42414140 - Container cranes

Indicators

  • Bids should cover the whole contract.
  • Options are available.
  • Renewals are not available.
  • Award on basis of price and quality.

Reference

Domains