M1 J10-13 DHS - Power Planing
A Tender Notice
by BALFOUR BEATTY CIVIL ENGINEERING LIMITED
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 21 month
- Value
- £25K
- Sector
- CONSTRUCTION
- Published
- 10 Oct 2023
- Delivery
- 25 Oct 2023 to 31 Jul 2025
- Deadline
- 24 Oct 2023 16:00
Concepts
Location






1 buyer
Description
M1 J10-13 Dynamic Hard Shoulder Upgrade Work Package: Power Planing How to Apply: Please email the below address: M1J10-11expressionofinterest@balfourbeatty.com Subcontracts must hold construction line Gold accreditation or equivilant to be considered for these works. Outline Scope The above scheme will require power planning of concrete areas to facilitate the upgrade of the central reservation. Required planed troughs will vary from 0.5m to 2.2m width with varying depths (0.05-0.2m), with 90-95% of all planed materials being concrete. The Subcontract Works are to be executed as part of the Main Contract Works set out below; Description / Overall Scope of Works The existing central reserve Vehicle Restraint System (VRS) is being upgraded along the section of motorway from Junction 10 to Junction 13 as part of the Dynamic Hard Shoulder (DHS) safety enhancement scheme. The barrier upgrade is to be a Rigid Concrete Barrier system that will be slip-formed in-situ or pre-cast. The in-situ barrier will be Davidsons Concrete Barrier (DCB). The Pre-cast barrier will be Deltabloc Barriers. At bifurcation locations either precast Delta bloc DB 80E barriers or precast DB 80AS-E will be used. As part of the central reservation upgrades works - the drainage system where required will also be upgraded - mainly between J11a and J12. In addition to the central reserve barrier upgrade there are 11no places of relative safety (PRS) to constructed, 5no on NB carriageway and 6no on SB carriageway. The PRS will compromise of localised widening by either re-grading the earthworks or by retentions solutions such as sheet pilling or precast concrete wall. Main Contract Period The contract programme is defined by the following key dates: The start of works date is 11th September 2023 The open for traffic date is 31st July 2025
CPV Codes
- 45000000 - Construction work
Indicators
- Contract is suitable for SMEs.
Reference
- M1 J10-3 DHS - Power Planing
- CF 66c9fe20-5ff3-41e5-b3fd-245026271936