Pagham Harbour SSSI - Unit 001 specialist lagoon survey
A Contract Award Notice
by NATURAL ENGLAND
- Source
- Contracts Finder
- Type
- Contract (Services)
- Duration
- 4.5 month
- Value
- £1K-£50K
- Sector
- PROFESSIONAL
- Published
- 13 Dec 2023
- Delivery
- 21 Aug 2023 to 31 Dec 2023
- Deadline
- 11 Aug 2023 16:00
Concepts
Location
1 buyer
- Natural England Worthing
1 supplier
- Envision Marine Hexham
Description
To apply please respond to the attached Invitation to Quote and associated documents. Email your response to kate.bull@naturalengland.org.uk. Tenders to be received no later than 17:00 on 11th August 2023. Clarification questions deadline is 3rd August 2023. The request is for quotations to conduct saline lagoon survey of Pagham Harbour SSSI lagoon. The survey will follow sampling plans from previous surveys of the site to identify state and changes in state for an ecological component of biodiversity, and identify whether changes are due to natural change or as a result of anthropogenic activities, The key objectives for the survey are to: 1. Provide an assessment of the direction of ecological change by the integration of previously obtained relevant data. 2. Repeat the previously used survey design to ensure the data are statistically robust enough to enable the collection of compatible future data and comparison with previous surveys of the site permitting quantitative long-term trend analysis. 3. Identify anthropogenic influences, impacting on the ability of the sub-feature to achieve Favourable Condition, and where possible quantify them. 4. Ensure that newly collected data is compatible (analytically) with historical survey data, and will make reference to and utilise such historical data. Data sampling and analysis will adhere to the standards set out in the RFQ
Award Detail
1 | Envision Marine (Hexham)
|
CPV Codes
- 79311000 - Survey services
Indicators
- Contract is suitable for SMEs.
Other Information
Proposals are requested to provide information required in the RFQ. The timeline given in the RFQ will be followed to enable the project to be delivered by end of December 2023 or sooner. Additional contact: Danielle Barratt danielle.barratt@naturalengland.org.uk 2128766270hs_operational_instruction_contractor_competence.pdf 2436684355hs_contractor_site_induction_checklist.docx CSM-Lagoons-2004.pdf D2016 00121930 Bamber & Robbins 2010 Isle of Wight Lagoons Report 2010.PDF fct_1000620_f.pdf NECR039 edition 1.pdf RFQ Document Pagham_Harbour RFQ_NEW.docx NE_Commercial Response basic.docx NE_Standard_Condensed_Terms.doc Pagham lagoon survey_Envision_Standard Condensed Terms_Redacted.pdf
Reference
- PH_LAG 2023
- CF 0afbf3ac-276d-46e4-916e-c0bc09e7f144