Tower Bridge Fire Suppression Works
A Prior Information Notice
by CITY OF LONDON CORPORATION
- Source
- Find a Tender
- Type
- Future Contract (Works)
- Duration
- not specified
- Value
- 4M
- Sector
- INDUSTRIAL
- Published
- 23 Jan 2024
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Tower Bridge
1 buyer
- City of London Corporation London
Description
1. Replacement of the existing fire suppression system in the Towers with a new fire suppression system, recommended to be a standard sprinkler (water) system and which will cover: a. The Towers b. The Walkways c. The Abutments d. The Engine Rooms and Shop (museum on the south shore) 2. Possible refurbishment or replacement (to be confirmed) of the existing gas suppression system in the machine rooms (northeast, northwest, southeast, southwest) 3. Connecting the fire suppression systems to the BMS 4. Boosting the water mains and domestic water supplies to support the new fire suppression system (to include infrastructure upgrades with Thames Water and the coordination of that) 5. Placement of the fire suppression tanks in the recommended location (currently under investigation)
Total Quantity or Scope
The Corporation’s intention is to use an Open Sub-FTS, Two-Stage Design and Build Procedure for this procurement process. The ITT is estimated to be released in early March 2024 via the City of London Corporation tendering Portal, CapitalEsourcing.
CPV Codes
- 45343000 - Fire-prevention installation works
- 51700000 - Installation services of fire protection equipment
Indicators
Other Information
Overview of Evaluation - Team - Programme - Methodology/Approach (Design/PSCA/main works) - Access and Logistics - Experience/Case Studies Responsible Procurement: - RP1 - Climate Action - RP2 - Climate Action - RP3 - Social Value (Pass/Fail) - RP4 - Social Value
Reference
- FTS 002282-2024