MA17 - Site Investigation & Anchoring for FOW

A Tender Notice
by OFFSHORE RENEWABLE ENERGY CATAPULT

Source
Contracts Finder
Type
Contract (Services)
Duration
1 year
Value
£140K
Sector
INDUSTRIAL
Published
24 Jan 2024
Delivery
25 Mar 2024 to 24 Mar 2025
Deadline
21 Feb 2024 12:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

Description

One challenge for the deployment of Floating Offshore Wind Turbines (FOWTs) is designing and installing anchors that are both reliable and cost-effective, whilst being capable of withstanding the dynamic loads exerted by the mooring lines. Site investigation is a critical stage in the design of these anchors. It gives vital data on seabed geology, soil properties, and environmental conditions, all of which influence the choice of anchor type, its performance, and the installation method. The site investigation for offshore anchors typically encompasses a mix of geophysical and geotechnical surveys. The specific methods and equipment used are dictated by the characteristics of the site in question.

CPV Codes

  • 71621000 - Technical analysis or consultancy services

Indicators

  • Contract is suitable for SMEs.

Reference

Domains