AFBI - SUPPLY, DELIVERY, AND SERVICING OF AUTOMATED HEAD-CHAMBER SYSTEMS (AHCS)
A Contract Award Notice
by AGRI-FOOD AND BIOSCIENCES INSTITUTE NI
- Source
- Find a Tender
- Type
- Contract (Supply)
- Duration
- 1 year (est.)
- Value
- £2M
- Sector
- INDUSTRIAL
- Published
- 22 Feb 2024
- Delivery
- To 21 Feb 2025 (est.)
- Deadline
- n/a
Concepts
Location
Hillsborough
3 buyers
- Agri Food & Biosciences Institute NI Hillsborough
- Agri Food & Biosciences Institute NI Belfast
1 supplier
- C Lock Rapid City
Description
The Livestock Production Sciences (LPS) Branch at Hillsborough of the Agri-Food and Biosciences Institute (AFBI) requires two (2) Automated Head-Chamber Systems (AHCS), one (1) for cattle and one (1) for sheep, for the quantification of methane, hydrogen and CO2 emissions and oxygen consumption on a daily basis (litter/day). AFBI requires the supply, delivery, and commissioning of the equipment. Warranty, servicing and reactive repair details are necessary requirements. On-site training in the operation of the supplied system is also required.
Award Detail
1 | C Lock (Rapid City)
|
Renewal Options
The Contract is for initial 1 year period with 4 options to extend for a further 1 year each
Award Criteria
COST | 90.0 |
QUALITY | 10.0 |
CPV Codes
- 38000000 - Laboratory, optical and precision equipments (excl. glasses)
- 38430000 - Detection and analysis apparatus
- 38432000 - Analysis apparatus
Indicators
- Options are available.
- Award on basis of price and quality.
Other Information
Contractors not delivering on contract requirements is a serious matter. It means the public purse is not getting what it is paying for. If a contractor fails to reach satisfactory levels of contract performance they will be given a specified time to improve. If, after the specified time, they still fail to reach satisfactory levels of contract performance, the matter will be escalated to senior management in CPD for further action. If this occurs and your performance does not improve to satisfactory levels within the specified period, this can be considered grounds for termination of the contract at your expense as provided for in the Conditions of Contract In lieu of termination CPD may issue a Notice of Written Warning or a Notice of Unsatisfactory Performance. A supplier in receipt of multiple Notices of Written Warning or a Notice of Unsatisfactory Performance may, in accordance with The Public Contracts Regulations 2015 (as. amended) be excluded from future public procurement competitions for a period of up to three years. The figure stated in V.2.4 is a. maximum that can be spent through the Contract over the full term and does not give any guarantee of any level of business that may. be awarded.. under. the agreement
Reference
- FTS 005838-2024