UKRI-3147 Procurement of Helium Compressor for LBNF Target

A Tender Notice
by UK RESEARCH & INNOVATION

Source
Contracts Finder
Type
Contract (Products)
Duration
1.5 year
Value
£230K
Sector
INDUSTRIAL
Published
13 Mar 2024
Delivery
28 May 2024 to 28 Nov 2025
Deadline
26 Apr 2024 13:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

Description

The compressor will be used in a closed-loop circuit to circulate helium gas at warm (non-cryogenic) temperatures. The helium is used to remove the c.25 kW heat load generated in a graphite target in the Long Baseline Neutrino Facility (LBNF) beamline at Fermilab, near Chicago. The target is required to convert a 1.2MW proton beam into a neutrino beam for the physics experiment DUNE. The delivery of a suitable compressor to Fermilab, along with other key helium circuit components outside the scope of this document, forms part of UKRI's Capital contribution-in-kind to the international DUNE collaboration.

CPV Codes

  • 42123100 - Gas compressors

Indicators

  • Contract is suitable for SMEs.

Other Information

Please follow this link to view the notice https://www.delta-esourcing.com/tenders/UK-UK-Swindon:-Gas-compressors./6F923MRX...

Reference

Domains