Highways Construction Scheme - M5 Junction 23 Dunball & A38 MRN (Somerset)
A Tender Notice
by SOMERSET COUNCIL
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 2 year
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 15 Apr 2024
- Delivery
- To 21 Jun 2026 (est.)
- Deadline
- 21 Jun 2024 12:00
Concepts
Location
Taunton
2 buyers
- Somerset Council Taunton
Description
Major highway and capacity improvement works at Dunball Roundabout, near Junction 23 of the M5 in Somerset. The Authority will use the NEC3 Engineering and Construction Contract for this work. The objective of the Authority is to deliver the following outcomes: • Increase capacity of the existing Dunball Roundabout, which will contribute towards the release of both Employment and Residential Developments in the wider Bridgwater area • Provision of additional facilities for non motorised users along the A38 corridor • Construction to be undertaken with least possible disruption to travelling public, and adjacent frontages, whilst still being undertaken with the highest priority being given to Health & Safety. Whilst the Authority is planning on entering into contract for the proposed work at Junction 23, there is also a desire by the Authority include the option of additional highway work in relation to the A38 MRN corridor within Somerset, which may include the following: • Major highway and capacity improvement works at Edithmead Roundabout near Junction 22 of the M5. • Junction improvements at Cross. • An improved crossing at the A38 Strawberry Line crossing on Shute Shelve. This additional work on the A38 MRN is at the sole discretion of the Authority and is by no means guaranteed.
Total Quantity or Scope
Major highway and capacity improvement works at Dunball Roundabout, near Junction 23 of the M5 in Somerset: The principal works are in Bridgwater, Somerset and include but are not limited to : • Construction of a ‘cut through’ through the central island of the existing roundabout from south to east • Widening of all approaches to roundabout • Signalisation of junction • New at grade pedestrian / cycle crossing facilities on the southern, western and northern approaches to the junction. • New at grade pedestrian / cycle crossing on the A38 to the north near the junction with Downend Rd • Provision of enhanced pedestrian / cycle facilities • Extensive new surface water drainage • Provision of lighting & Signage • Extensive utility service protection works together with limited diversionary works Description of possible future work, at the sole discretion of the Authority, for additional highway works along the A38 MRN corridor in Somerset: The works at Edithmead (M5 J22), Somerset involve works on both the Local Authority Highway Network and National Highways Network and include but are not limited to: • Construction of a ‘cut through’ through the central island of the existing roundabout from East to north • Widening of all approaches to roundabout • Signalisation of junction • New at grade pedestrian / cycle crossing facilities on the western approaches to the junction. • Provision of enhanced pedestrian / cycle facilities • Extensive new surface water drainage, including a Surface Water Retention pond • Construction of a number of small retaining walls (Contractor Design) • Provision of lighting & Signage • Extensive utility service protection works together with limited diversionary works The works at Cross, Somerset include but are not limited to: • Construction of a new section of ‘Link Road’ to create a ‘Staggered cross Road’ • Potentially new at grade pedestrian / cycle crossing facilities across the A38 • Provision of enhanced pedestrian / cycle facilities • Extensive new surface water drainage, including a Surface Water Retention pond • Provision of lighting & Signage • Extensive utility service protection works together with limited diversionary works The works at the A38 Strawberry Line Crossing, Somerset include but are not limited to: • Upgrading of an existing uncontrolled crossing to a signal controlled Toucan Crossing & • Provision of lighting & Signage
Award Criteria
Quality | 30.0 |
Social Value | 5.0 |
PRICE | 65.0 |
CPV Codes
- 45000000 - Construction work
Indicators
- Bids should cover the whole contract.
- Renewals are not available.
- Award on basis of price.
Reference
- FTS 012209-2024