Non-Infrastructure Medium Project Work
A Utilities Contract Award Notice
by THAMES WATER UTILITIES LIMITED
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 8 year (est.)
- Value
- £2M
- Sector
- CONSTRUCTION
- Published
- 16 May 2024
- Delivery
- To 04 Apr 2032 (est.)
- Deadline
- n/a
Concepts
Location
Reading
2 buyers
- Thames Water Utilities Reading
23 suppliers
- Bridges Electrical Engineers Midsomer Norton
- Enisca Cookstown
- Enpure Rubery
- Gel Engineering Enfield
- Tes Group County Tyrone
- Bilfinger Warrington
- Avrs Systems Cumbria
- Morrison Water Services Stevenage
- Jackson Civil Engineering Group Ipswich
- Clancy Docwra Harefield
- Montel Civil Engineering Worcester
- Falco Construction Middlesex
- Dyer & Butler Hertfordshire
- J Browne Construction Leeds
- Ross Shire Engineering Muir of Ord
- Stonbury Bedfordshire
- Ward & Burke Construction Kilcolgan
- Trant Engineering Southampton
- Unnamed None
- Cleantech Civils Chester
- Northavon Group Radstock
- Havering Building Specialists Romford
- Barhale Walsall
Description
Non-infrastructure MEICA and Civils ~ Medium (RW1) Project Work. TWUL are procuring delivery capability for Non-Infrastructure projects. TWUL recognises non-infrastructure as nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water's water and wastewater non-infrastructure (treatment) assets across the Thames Water region. The Non-infrastructure scope includes refurbishment, replacement and provision of new potable water and wastewater treatment assets including service and storage reservoirs Water non infrastructure scope includes but is not limited to: - refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, - disinfection, - surge protection, - chemical dosing, - supervisory control and data acquisition (SCADA), - run-to-waste facilities, - cartridge filters and UV, - increased power resilience, - inspection and maintenance of existing service and storage reservoirs. Wastewater non-infrastructure scope includes but is not limited to: - refurbishment, replacement and provision of new treatment facilities such as inlet works, - storm water storage, - event duration monitors, - settlement tanks, - biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), - digester roof replacement, - combined heat and power (CHP), - chemical dosing, - phosphorous removal, - odour control, - SCADA, - increased power resilience. two.1.5) Estimated total valueII.1.5) Estimated total value Value excluding VAT: £500,000,000 two.1.6) Information about lotsII.1.6) Information about lots This contract is divided into lots: Yes Tenders may be submitted for one lot only
Lot Division
1 | Non-infrastructure MEICA Medium Project Works Non-infrastructure Mechanical, Electrical, Instrumentation, Control & Automation systems project works including the refurbishment, replacement, and maintenance as described above in section ll.1.4 The work described in II.4.1 (Short Description) is Thames Water's Runway 1 (RW1). Thames Water has four runways: RW0 is Small Project Work where works contracts are expected to typically be greater than £250k in value. RW1 which is the subject of this procurement is intended to be used for Non-Infrastructure works with a values between £250k and £5m (but exceptionally works may fall outside those boundaries) RW2 is Framework Agreement (Thames Wide and Geographic) which is for Infrastructure and Non-Infrastructure works with a value ranging between £5m and £25m RW3 is Major Projects for works with generally exceeding £25m It is intended, but not guaranteed, that Thames Water will generally allocate works contracts with a value of up to £1.5m directly to the Framework Contractors, namely such contracts will be shared between the Framework Contractors without a mini-competition. There may however be some works contracts below that value which are more suitable for a mini-competition and there may be circumstances in which works contracts above that value are directly allocated. The aggregate Value of Contracts directly allocated to each Framework Contractor over the Term is intended to be the same. Please refer to Appendix 9 (Call-Off Procedures) of the draft Framework Agreement for further information on the procedure for the allocation of works. |
2 | Civil Medium Project Work Non-infrastructure civils project works as described above in section II.1.4. The work described in II.4.1 (Short Description) is Thames Water's Runway 1 (RW1). Thames Water has four runways: RW0 is Small Project Work where works contracts are expected to typically be greater than £250k in value. RW1 which is the subject of this procurement is intended to be used for Non-Infrastructure works with a values between £250k and £5m (but exceptionally works may fall outside those boundaries) RW2 is Framework Agreement (Thames Wide and Geographic) which is for Infrastructure and Non-Infrastructure works with a value ranging between £5m and £25m RW3 is Major Projects for works with generally exceeding £25m It is intended, but not guaranteed, that Thames Water will generally allocate works contracts with a value of up to £1.5m directly to the Framework Contractors, namely such contracts will be shared between the Framework Contractors without a mini-competition. There may however be some works contracts below that value which are more suitable for a mini-competition and there may be circumstances in which works contracts above that value are directly allocated. The aggregate Value of Contracts directly allocated to each Framework Contractor over the Term is intended to be the same. Please refer to Appendix 9 (Call-Off Procedures) of the draft Framework Agreement for further information on the procedure for the allocation of works. |
3 | Projects involving both MEICA and Civils Works Projects involving both MEICA and Civils Works as described in II.1.4. The work described in II.4.1 (Short Description) is Thames Water's Runway 1 (RW1). Thames Water has four runways: RW0 is Small Project Work where works contracts are expected to typically be greater than £250k in value. RW1 which is the subject of this procurement is intended to be used for Non-Infrastructure works with a values between £250k and £5m (but exceptionally works may fall outside those boundaries) RW2 is Framework Agreement (Thames Wide and Geographic) which is for Infrastructure and Non-Infrastructure works with a value ranging between £5m and £25m RW3 is Major Projects for works with generally exceeding £25m It is intended, but not guaranteed, that Thames Water will generally allocate works contracts with a value of up to £1.5m directly to the Framework Contractors, namely such contracts will be shared between the Framework Contractors without a mini-competition. There may however be some works contracts below that value which are more suitable for a mini-competition and there may be circumstances in which works contracts above that value are directly allocated. The aggregate Value of Contracts directly allocated to each Framework Contractor over the Term is intended to be the same. Please refer to Appendix 9 (Call-Off Procedures) of the draft Framework Agreement for further information on the procedure for the allocation of works. two.2.5) Award criteriaII.2.5) Award criteria |
Award Detail
1 | Bridges Electrical Engineers (Midsomer Norton)
|
2 | Enisca (Cookstown)
|
3 | Enpure (Rubery)
|
4 | Gel Engineering (Enfield)
|
5 | Tes Group (None)
|
6 | Bilfinger (Warrington)
|
7 | Avrs Systems (Cumbria)
|
8 | Morrison Water Services (Stevenage)
|
9 | Jackson Civil Engineering Group (Ipswich)
|
10 | Clancy Docwra (Harefield)
|
11 | Montel Civil Engineering (Worcester)
|
12 | Falco Construction (Middlesex)
|
13 | Dyer & Butler (Hertfordshire)
|
14 | J Browne Construction (Leeds)
|
15 | Ross Shire Engineering (Muir of Ord)
|
16 | Stonbury (Bedfordshire)
|
17 | Ward & Burke Construction (Kilcolgan)
|
18 | Trant Engineering (Southampton)
|
19 | Unnamed (None)
|
20 | Cleantech Civils (Chester)
|
21 | Northavon Group (Radstock)
|
22 | Havering Building Specialists (Romford)
|
23 | Barhale (Walsall)
|
CPV Codes
- 45000000 - Construction work
- 45310000 - Electrical installation work
- 45351000 - Mechanical engineering installation works
- 45232421 - Sewage treatment works
- 45232422 - Sludge-treatment works
- 45232423 - Sewage pumping stations construction work
- 45232430 - Water-treatment work
- 45232431 - Wastewater pumping station
- 45232440 - Construction work for sewage pipes
- 45232450 - Drainage construction works
- 45232451 - Drainage and surface works
- 45232453 - Drains construction work
- 45350000 - Mechanical installations
Indicators
- Options are available.
Other Information
** Please note, this is a Contract Award Notice **
Reference
- FTS 015540-2024