Mox Fuel Line

A Contract Award Notice
by NATIONAL NUCLEAR LABORATORY LIMITED

Source
Find a Tender
Type
Contract (Works)
Duration
not specified
Value
£30M
Sector
INDUSTRIAL
Published
08 Jul 2024
Delivery
From 01 May 2023 (est.)
Deadline
n/a

Concepts

Location

Sellafield

Geochart for 2 buyers and 1 suppliers

2 buyers

1 supplier

Description

The current Fuel Line located in National Nuclear Laboratory's (NNL's) Central Laboratory was designed and installed in the mid-2000's in Area 400 to provide research and development (R&D) support to Sellafield Mixed Oxide (MOx) Plant (SMP), which utilised the Short Binderless Route (SBR) for producing MOx. However, the Fuel Line was never fully commissioned and has remained in a state of Care and Maintenance (C&M) since then. The intent is to re-purpose the above existing fuel line, whilst keeping certain elements embedded within the design. The scope of the works required is therefore to Design, Install and provide technical support to Commissioning for the Fuel Line for future usage by the NDA.

Total Quantity or Scope

Nuclear Decommissioning Authority (NDA) is responsible for the current civil plutonium stockpile. It is currently considering options for plutonium disposition including reusing the material within new MOx fuel (

Award Detail

1 Orano (Abingdon)
  • MOx Fuel Line
  • Reference: nnlc123
  • Num offers: 1
  • Value: £30,000,000
  • Contractor is an SME.

Award Criteria

PRICE _

CPV Codes

  • 45351000 - Mechanical engineering installation works
  • 09340000 - Nuclear fuels
  • 45251110 - Nuclear-power station construction work
  • 45300000 - Building installation work
  • 71300000 - Engineering services

Indicators

  • Award on basis of price.

Reference

Domains