NRV Culverts NM Corner
A Tender Notice
by NATURAL ENGLAND
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 7 month
- Value
- £33K
- Sector
- CONSTRUCTION
- Published
- 30 Jul 2024
- Delivery
- 01 Sep 2024 to 31 Mar 2025
- Deadline
- 15 Aug 2024 16:00
Concepts
- culverts
- westhay
- the north moor corner raised water level area
- nrv culverts nm corner
- construction culvert sequence
- somerset idb gateway construction culvert sequence guide - utilising steel motorway barrier
- the north moor corner raised water level
- three existing 450mm culverts fitted and non-return valves
- nrv
- corner
Location
1 buyer
- Natural England Westhay
Description
Description of Works Refer to attachment: Natural England Specifications of Requirements - NRV Culverts NM Corner Replace three existing 450mm culverts fitted and non-return valves (flap valves) previously installed in the 1990s. Non-return valves were fitted to act as a water supply into the North Moor Corner Raised Water Level area when water levels within internal ditches are lower than external levels. Structures to allow passage of water into the raised water level area, but in an emergency can also be opened to allow evacuation of water during flood events. The wooden headwalls of the culverts are severely degraded and in places material compacted around the culvert pipes has collapsed into the field and ditch. Replacement structures are required. Each replacement culvert must be/have: • Rigid twin-walled plastic pipe • Internal pipe diameter 450mm • Pipe length 6000mm • Culvert pipe surround of geotextile membrane and clean, crushed, locally sourced stone • Motorway barrier headwalls with 450mm non-return (flap) valve (vertical component of headwall required to reach approximate depth of 3500mm to anchor the structure to the clay bed beneath the peat soils) • 12-foot metal gate with galvanised metal gate posts and wooden wings Working Method will follow: Somerset IDB Gateway Construction Culvert Sequence Guide - utilising Steel Motorway Barrier Headwalls Working area must be isolated with sheet piling and drained prior to commencement of works. Location of works: Wisteria Farm, Middlemoor Drove, North Newton. TA7 0BT. What3Words for the three culvert locations: crowds.supreme.swerving prowling.manicured.safari nuggets.rejoined.grant
CPV Codes
- 45221220 - Culverts
Indicators
- Contract is suitable for SMEs.
Other Information
To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation (RFQ) with supporting evidence from attachments: Natural England Specifications of Requirements - NRV Culverts NM Corner, NM Corner IDB Consent Applications NRV1,2 and 3 Culverts, Somerset IDB Gateway Culvert Construction Sequence Guide, Commercial Response Template, and if required, Natural England H&S Contractor Competence. Your response must be sent to philip.thorpe@naturalengland.org.uk by 17:00pm on 15/08/24. If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to philip.thorpe@naturalengland.org.uk. Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers. RFQ Request for Quotation - NRV Culverts NM Corner.docx Order Form NE Standard Goods & Services Terms and Conditions - NRV Culverts.docx Commercial response template.docx NRV1 Culvert NM Corner IDB Consent Application.pdf NRV2 Culvert NM Corner IDB Consent Application.pdf NRV3 Culvert NM Corner IDB Consent Application.pdf Natural England H&S Contractor Competence form.docx Natural England Specifications of Requirements - NRV Culverts NM Corner.docx Somerset IDB Gateway Culvert Construction Sequence Guide.pdf
Reference
- NE300724NRVCNMC
- CF 8afad151-21e8-4d77-9b46-6bec8cef76f7