Diamond-II Booster Girder Asssemblies
A Contract Award Notice
by DIAMOND LIGHT SOURCE LTD
- Source
- Find a Tender
- Type
- Contract (Goods)
- Duration
- not specified
- Value
- 7M
- Sector
- INDUSTRIAL
- Published
- 31 Jul 2024
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Oxfordshire:
1 buyer
- Diamond Light Source Didcot
1 supplier
- Danfysik A S Taastrup
Description
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the structure and behaviour of the world around us at the atomic and molecular level. To continue delivering the world-changing science that Diamond enables, the facility is being upgraded to Diamond-II, a co-ordinated programme of development that combines a major machine upgrade with new instruments and complementary improvements to optics,detectors, sample environment and delivery capabilities, and computing, as well as integrated and correlative methods. This will be transformative in speed and spatial resolution and will offer users streamlined access to enhanced instruments for life and physical sciences. The scope of this contract is to carry out detailed design, manufacture, quality control, magnetic measurements and delivery to Diamond of a series of ready-to-install "girder assemblies" for the booster synchrotron upgrade part of the Diamond-II project.
Total Quantity or Scope
A total of 50 girder assemblies are required of various types containing different combinations of dipole, quadrupole, sextupole and corrector magnets. The girder assemblies will include the UHV vacuum vessel assembly running through the magnet gaps, including Beam Position Monitors (BPM), bellows, flanges and all necessary vacuum pumps and instrumentation, as well as their support pedestals, adjustment system and baseplates. The booster will operate at 5 Hz repetition frequency and hence all magnets must be of a laminated construction. The girder assemblies must be designed and constructed so as to be able to be fitted together to form sections of the Diamond Booster synchrotron. The vacuum assemblies must be baked-out before integration in the magnets without venting and supplied under vacuum. The magnets and vacuum components are to be mounted and accurately aligned on the girders, complete with all service and interlock connections to suitable manifolds and electrical termination boards, by the Supplier, ready for installation. The Supplier will carry out full mechanical, electrical and magnetic testing of the individual magnetic elements, vacuum tests to ensure UHV compatibility, as well as other tests of components and complete assemblies.
Award Detail
1 | Danfysik A S (Taastrup)
|
Award Criteria
Technical Quality | 30 |
Previous Experience | 15 |
Delivery | 10 |
Commercial | 5 |
price | 40 |
CPV Codes
- 31730000 - Electrotechnical equipment
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-0452b5
- FTS 023922-2024