PSF4 Lot 4B- Abbey Road and Duke Street Active Travel

A Contract Award Notice
by WESTMORLAND AND FURNESS COUNCIL

Source
Contracts Finder
Type
Framework (Services)
Duration
7.5 month
Value
£150K
Sector
CONSTRUCTION
Published
06 Aug 2024
Delivery
17 Jul 2024 to 28 Feb 2025
Deadline
19 Jun 2024 11:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers
Westmorland & Furness Council
AECOM
Leaflet | Map tiles by Stamen Design, under CC BY 3.0. Data by OpenStreetMap, under ODbL.

1 buyer

1 supplier

Description

Westmorland and Furness Council ('the Council') is seeking to appoint a multidisciplinary consultancy team to undertake scheme development and preliminary design for two LTN1/20 compliant cycling, walking and wheeling routes in Barrow-in-Furness. The routes are along an ~1.87km length of Abbey Road (between the junctions with Park Drive and Ratings Lane) and an ~0.4km length of Duke Street (between Ramsden Square and Schneider Square). Both routes are identified with the Barrow-in-Furness Local Cycling and Walking Infrastructure Plan (LCWIP). This document sets out the Councils priorities for the delivery of cycling and walking improvements at a local level over the period 2022-2037, with the aim of encouraging more people to make journeys on foot or by bike. The Council has developed costed feasibility/concept designs for both routes and have secured funding for the next stage of design development through the Active Travel Fund 4 (ATF4) and Active Travel Fund 4 Extension (ATF4E). The Council now requires support to develop both routes to a preliminary level of design (RIBA Stage 3, or equivalent), produce costing and prepare documentation to support a future bid for delivery funding.

Award Detail

1 AECOM (London)
  • Value: £129,854

CPV Codes

  • 71000000 - Architectural, construction, engineering and inspection services

Indicators

  • Contract is suitable for SMEs.

Reference

Domains